Log in
Forum
Topic

showers required in retail

Retail-NC-v4 LTc6: Bicycle facilities
posted by Deborah Stadler on Mar 15, 2023, 9:10 am

For LEED v4 NC Retail are showers required?  For LEED v4 CI Retail are showers required?  The credit language and guide specifically appear to explicitly exclude showers in CI Retail, but not in...

Question about Rainwater Tank volume

CS-v4 SSc4: Rainwater management
posted by Konstantina Kalliakoudi on Mar 15, 2023, 9:55 am

Hello  LEED experts,

I have a project with a small Open space, so the...

Indoor Water use Fixtures Calculations

EBOM-v4 WEc2: Indoor water use reduction
posted by Michael Abdelmessih on Mar 15, 2023, 12:25 pm

Hi everyone,

I have a question today concerning the Indoor Water Use calculator for LEED...

DES Systems

NC-v4 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Mar 16, 2023, 7:02 am

Dear LEEDUser friends,

for a project with district systems where Option 1, Path 1 will be implemented how will be the HVAC efficiencies for the proposed model defined? Appendix G, G3.1.1.1...

DES Systems

NC-v4 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Mar 16, 2023, 7:07 am

Dear LEEDUser friends,

for a project with district systems where Option 1, Path 1 will be implemented how will be the HVAC efficiencies for the proposed model defined? Appendix G, G3.1.1.1...

District Energy Systems

NC-v4 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Mar 16, 2023, 7:11 am

Dear LEED User friend,

We are involved in a project with...

District Energy Systems

NC-v4 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Mar 16, 2023, 7:13 am

Dear LEED User friend,

We are involved in a project with...

District Energy Systems

NC-v4 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Mar 16, 2023, 7:16 am

Dear LEED User friend,

We are involved in a project with...

Glare control devices for residential projects

NC-v4 EQc7: Daylight
posted by Sana Hafsa on Mar 17, 2023, 8:48 am

I have a residential project aiming for certification under LEED v4 NC BD+C (the buildings are over 8 floors). The Daylight credit includes "Provide manual or automatic (with manual override)...

Outdoor Water Use credit- LEED V4.1

NC-v4.1 WEc1: Outdoor water use reduction
posted by Maria Farah on Mar 17, 2023, 12:57 pm

In LEED BD+C: New Construction V4.1, the outdoor water use reduction credit (2 points) states that alternative water sources can be used to achieve an additional 30% reduction. However, unlike in...