Furniture

CI-2009 MRc7:Certified Wood
posted by  Nelina Loiselle  on 

Furniture is not a part of our scope of work. Do we have to include it?

5
Environmental Stewardship Manager
Tarkett North America
LEEDuser Basic Member
64 thumbs up
Thu Sep 13, 2012, 1:04 pm

Multiple type of flow or flush fixtures

NC-2009 WEc3:Water Use Reduction
posted by  Yusuf Turab  on 

I have never quite understood what happens when a building uses many different types of fixtures.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Sep 13, 2012, 4:55 am

Confirmation of Commissioning Experience

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Scott Rosch  on 

Given the subjective nature of LEED credit reviews, and the fact that a contract for commissioning is awarded and so much of the work is done prior to review of this credit, is there a means of ob

2
Partner
Viridian
LEEDuser Basic Member
154 thumbs up
Wed Sep 12, 2012, 6:24 pm

Absolute 50% CDs for Enhanced Commissioning?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Nicole Ferrini  on 

I have a project that is approximately 75% complete with CD's. Both the CxA and myself (LEED AP) have just been brought on board. How strict is the 50% requirement for enhanced commissioning.

3
Director of Sustainability
PSRBB Commercial Group
LEEDuser Basic Member
8 thumbs up
Wed Sep 12, 2012, 6:22 pm

school example in documentation toolkit?

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  William Weaver  on 

I was wondering if the LEEDuser team could provide an example of a completed template for a school project in the documentation toolkit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 12, 2012, 4:31 pm

Discrepancy between forms

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Maura Adams  on 

For reasons I don't need to get into here, we started off using the LEED for School Beta form (version 0.2.3) but had to switch to Version 4.0.

3
Environmental Stewardship Manager
LEEDuser Basic Member
114 thumbs up
Wed Sep 12, 2012, 3:45 pm

Regularly occupied spaces in retail/grocery store?

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Alexander Aaltonen  on 

I am dealing with a case where the only explicit "work stations" are the cashier areas in the grocery store...

2
Wed Sep 12, 2012, 12:03 pm

Leed NC 2009 - documents to translate in english for reviews

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Nicolas MOLLE  on 

Hello, I'm working on my first certified leed project. My buildings is in France and all documents are written in french.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 12, 2012, 10:09 am

High Trans. Building - No fixtures for Trans. Occupants

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  James Del Monaco  on 

I have a 7,000 SF Physical Education Building which has a majority of the space decicated to PE type activities such as dancing, weightlifting, etc.

5
Default Avatar
Sustainability Director, PE
P2S Engineering, Inc.
LEEDuser Basic Member
48 thumbs up
Wed Sep 12, 2012, 1:22 am

Temporized shower

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Giorgia Lorenzi  on 

I have a metering shower: temporized for 30 second cycle, 10 liter/minute (from product data sheet). WEp1 simple form on leedonline notes "When using the metering lavatory faucet, please convert al

3
Tue Sep 11, 2012, 9:59 pm