Forum quick links
LEEDonline.com
posted by Rebekah Brown on
Can anyone tell me what the difference is between leedonline.com vs leedonline.usgbc.org? I have had several team members, understandably, become confused between the two sites.
Warehouse and FTE
NC-2009 PIf3:Occupant and Usage Dataposted by Jean-Baptiste Noel on
I am currently working on a building project that is a warehouse (distribution center).
Tenant commitment for Residential Building in NC Certification
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Melissa Merryweather on
I am looking at a mixed-use high-rise project with a residential portion.
Invoice for Wood in Assembly (Display Boards)
NC-2009 MRc7:Certified Woodposted by Carly Ruggieri on
I've had some major difficulty with documentation for Certified Wood due to small amounts of wood in assemblies, specifically the backing on markerboards/tackboards.
Multiple Buildings - Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Marina Andrade on
Hello, I'm working in a project that consists in a multiple building certification.
LEED C+S determination
posted by Chris DeVolder on
We have a client who is interested in pursuing LEED C+S for a football stadium project because of the types of spaces in the program.
Worsktation requirements
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by severine secret on
If I have a workstation made of Greenguard certified panels, Greenguard plastic laminate but particle board top that has no certification ( even though NAUF), can I still get the credit?
Furniture testing
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by severine secret on
If system furniture is manufactured in China and has been evaluated there, can someone at USGBC or SCS testing review the evaluation for possible approval of compliance with the credit requirements
3rd Party Independent Reviewer as Enhanced CxA
NC-2009 EAc3:Enhanced Commissioningposted by Lesley Treacy on
Hi, I have read through the comments and understand the requirements for the Enhanced Commissioner to be a 'disinterested' or 'independent' body.
onsite waste water treatment plant
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Razan Nejem on
if our building is part of a bigger development which has a central waste water treatment plant does this count as being an onsite plant and will it count towards option 2.reducing 50% of building