Topic | Recent |
---|---|
RE: CIRs and LEED Interpretation changesGeneral forumsposted by David Posada on Sep 3, 2010, 4:23 pm
I agree this is a step in the right direction, and can think of some refinements that might go further. Pardon my long response. Two of the barriers to implementing LEED are uncertainty... |
|
Tracking Energy UseNC-2009 EAc1: Optimize Energy Performanceposted by Elizabeth McPherson on Sep 3, 2010, 1:51 pm
I just read (in a really scarey article by an attorney who'd describing the legal implications of buildings whose certifications are challenged and revoked) that we must now provide one-year... Last reply: Tristan Roberts, Sep 3, 2010, 2:11 pm |
|
CS Appendix 3General forumsposted by Tristan Roberts on Sep 3, 2010, 12:58 pm
Yes, the best resource for this as far as LEED is concerned is CS Appendix 1 from the BD&C LEED Reference Guide. It gives default occupancy counts for different space types. |
|
Questions Re: LEED BD+C ID credit for use of LEED-EBOMCS-2009 IDc1: Innovation in Designposted by V. Miller on Sep 3, 2010, 9:54 am
For a LEED CS 2009 project: 1. To earn a LEED ID credit 1 credit for use of a LEED-... Last reply: Tristan Roberts, Sep 3, 2010, 10:57 am |
|
5 building structures 5 models or 1 model as a whole?NC-2009 EAc1: Optimize Energy Performanceposted by Vivian Wan on Sep 3, 2010, 6:19 am
If there are 5 building structures in the project, shall I perform separated energy simulation models for 5 individual structures, or 1 model as a whole? Last reply: Marcus Sheffer, Sep 3, 2010, 8:47 am |
|
Energy Star Score Falling Below 69 for a MonthEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Jessica Hawley on Sep 2, 2010, 6:05 pm
In performing the initial analysis of the Energy Star score for our building it has become apparent we are teetering on the line of a 69. Is it required to hold an Energy Star score of 69... Last reply: Chris Nixon, Sep 3, 2010, 7:35 am |
|
System No.: Systen 3 – PSZ-AC w-district heatingNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Aug 30, 2010, 7:54 am
I need to pin down the required efficiencies. System Type: Packaged rooftop air conditioner Last reply: Jean Marais, Sep 3, 2010, 7:02 am |
|
SWPPP required?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Tatjana Ernst on Jul 9, 2010, 8:11 am
Hello everyone, we have a office building in Vienna Austria). I am wondering if we have to do an SWPPP. According to the EPA Fact Sheet... Last reply: Tatjana Ernst, Sep 3, 2010, 3:08 am |
|
What are my RP Credits?EBOM-2009 RPc1: Regional Priorityposted by John Ware on Sep 1, 2010, 7:25 pm
Our zip code, 64153, is not listed. Remarkably, most of Kansas City, MO is 641xx! I know KC has been omitted from the RP list since the RP list was published ~ 2 years! USGBC's advice is to... Last reply: John Ware, Sep 2, 2010, 8:14 pm |
|
Re: Construction DocumentsGeneral forumsposted by David Posada on Sep 2, 2010, 4:35 pm
Implementing LEED requirements during construction is a balancing act: provide too little information, guidance, or follow-up and some things will fall between the cracks, but if you provide too... |