Topic | Recent |
---|---|
Mechanical/HVAC Engineer sign-offEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Janna Nash on Feb 3, 2010, 9:50 pm
Could somebody tell me which... Last reply: Avkash Patel, Nov 10, 2010, 5:24 pm |
|
LEED O+M 2009 vs LEED O+M 2012General forumsposted by Avkash Patel on Nov 9, 2010, 2:35 pm
Great Analysis of the two rating systems. I am a LEED AP O+M and for my own knowledge I will be analyzing the 2009 LEED O+M system with the proposed 2012 LEED O+M system. If anyone is interested... Last reply: Avkash Patel, Nov 10, 2010, 3:38 pm |
|
LPD and HospitalsCI-2009 EAp2: Minimum Energy Performanceposted by Neil Rosen on Nov 10, 2010, 10:56 am
How do I document exam lighting and the like which is excluded by ASHRAE? Last reply: Paul Conrad, Nov 10, 2010, 2:17 pm |
|
Commissioning of On-Site Renewable Energy SystemsNC-2009 EAc3: Enhanced Commissioningposted by Lauren Sparandara on Oct 21, 2010, 4:03 pm
Today we received a clarification request for our Commissioning credit because our PV system has not yet been commissioned at the time of our submission. Our PV system has not yet been... Last reply: Lauren Sparandara, Nov 10, 2010, 1:59 pm |
|
Credit "Optimize Energy Performance" in Appeal PhaseCS-2009 EAc1: Optimize Energy Performanceposted by Florian Schmidtchen on Nov 10, 2010, 2:57 am
We are managing the certification of an office building according LEED C&S 2009. Due to contractual reasons, the building owner has to reach LEED silver to sell the building to his client.... Last reply: Marcus Sheffer, Nov 10, 2010, 9:04 am |
|
How Sophisticated Should Functional Tests Be?NC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Omer Moltay on Sep 5, 2010, 6:22 am
Dear All, Our... Last reply: Al Tibbs, Nov 10, 2010, 8:36 am |
|
maintenance equipmentEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Rachael McClain on Nov 9, 2010, 1:19 pm
I just wanted to clarify the requirements of the maintenance equipment because looking at the template is confusing me. Do I meet requirements if I have five pieces of equipment and one of those... Last reply: Jason Franken, Nov 9, 2010, 7:11 pm |
|
Green PowerCI-2009 EAc4: Green Powerposted by Holly Himes on Nov 9, 2010, 3:43 pm
If I purchase my Green Power RECS and then don't submit for say 9 months will the contract still cover my project timeline? Last reply: Lana Malone, Nov 9, 2010, 3:47 pm |
|
Requirement for landscape but not open spaceNC-2009 SSc5.2: Site development - maximize open spaceposted by Lauren Sparandara on Nov 8, 2010, 7:53 pm
Hello, My project has a requirement for landscaping as the city requires that at least 20% of the site is landscaped. Should we state that we fall under Case 1 even though there isn't... Last reply: Devon Bertram, Nov 9, 2010, 10:51 am |
|
Frequency of InspectionsEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Maria Unruh on Nov 8, 2010, 5:06 pm
In looking to achieve this credit, I am planning on writing a... Last reply: Pierce Holstrom, Nov 8, 2010, 7:44 pm |