We are working in Colombia on a new 4,840sqft "dinning room facility" that will serve all users 24/7 of already existing administrative offices and truck drivers (this existing facilities are not... Last reply: Edgar Rodriguez, Dec 23, 2013, 4:33 pm |
|
Option 2 fails TVOC- will Retest Pass?NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Sandi Carney on Mar 7, 2014, 1:19 pm
I was the responsible party who ran the baseline... Last reply: Dale Walsh, Mar 12, 2014, 12:11 pm |
|
Air flow measurement for non densely occupied zonesNC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Magda Aghababyan on Mar 12, 2014, 6:55 am
Dear Sir/ Madam, I have a project that is a hotel with 200 guest rooms that are non-densely occupied. Each guest room floor (20 rooms per floor) is supplied with 3 AHUs. Therefore 100% of... Last reply: Magda Aghababyan, Mar 13, 2014, 11:47 pm |
|
Revisions to design submittal during CD submittalLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by PATRICK HILLIER on Mar 13, 2014, 10:29 am
As part of my CD submittal response - that had corrections to my design submittal final - there were files that I was fairly certain I had uploaded but the response was "no new information was... Last reply: Adrienn Gelesz, Mar 13, 2014, 11:37 am |
|
Timing of systems manualsNC-2009 EAc3: Enhanced Commissioningposted by Melinda Shah on Mar 13, 2014, 3:10 pm
The LEED NC multiple building project we are working on has been occupied for 6-18 months (depending on the building) and we have everything ready to submit everything for the construction review... Last reply: Joyce Kelly, Dec 9, 2015, 2:18 pm |
|
Regional points for EAc1- Optimize Energy PerformanceNC-2009 RPc1: Regional Priorityposted by Mariah Grife on Mar 24, 2014, 1:29 pm
My project has EA c1 listed as a possible Regional Priority credit. This credit allows 1-19 points, does my project apply for a Regional credit if I get even (1) point on EAc1? Or is there a... Last reply: Mariah Grife, Mar 24, 2014, 1:47 pm |
|
Concrete Recycled ContentNC-2009 MRc4: Recycled Contentposted by MT A on Mar 28, 2014, 11:26 am
We have the final content $ value of cementitious materials and the m3 of concrete produced as supplied by the contractor. Could someone advise on the correct way to calculate the... Last reply: Ruju Rathod, Sep 2, 2021, 11:49 am |
|
Natural ventilation of interior roomsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Erika Duran on Apr 9, 2014, 11:10 am
We are working on a multifamily building with naturally ventilated interior kitchens located next to the living/dining rooms that have operable windows. The kitchens meet 62.1-2007 section 5.1.1... Last reply: Andrew Mitchell, P.E., Apr 9, 2014, 6:46 pm |
|
intensive vs. extensive green roofsNC-2009 SSc7.2: Heat island effect - roofposted by Davis Kantor on Apr 28, 2014, 9:38 am
My recent research shows that installing a green roof system on a project aimed at LEED certification has the potential to contribute to the following LEED credits: Last reply: Davis Kantor, May 3, 2014, 4:47 pm |
|
Primers- really?NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Keith Robertson on Apr 29, 2014, 10:12 am
In my opinion, LEED 2009 incorrectly categorizes primers. I know that the table issued with the 4/14/10 addendum clearly lumps primers into the GS-11 requirements. This I don’t understand. In... Last reply: Jon Clifford, Apr 28, 2015, 5:42 am |