I was the responsible party who ran the baseline IAQ testing event a a newly constructed 6,000 SF teaching facility. The TVOC results came back yesterday and were 4,900 ug/m3. This is ten times the allowable maximum for the LEED credit. The next step is a flush out and re-test, right? I was asked what the likelihood of passing with below 500 ug/m3 TVOC is after completing the flush out. Do you have experience that would lend way to an answer?