Topic | Recent |
---|---|
LEED Online form improvementsGeneral forumsposted by Tristan Roberts on Jul 19, 2010, 12:27 pm
Bruce, I recommend you review LEED Online's... Last reply: Breana Detzler, Apr 26, 2011, 3:35 pm |
|
Thermal Comfort Survey SoftwareNC-2009 IEQc7.2: Thermal comfort - verificationposted by Danny Vandoren on Jul 19, 2010, 11:16 am
I was curious if anyone had tried any of the thermal comfort survey software options. I came across too options online: Berkeley Survey $1000 Last reply: Jonathan Weiss, Jan 24, 2011, 2:01 pm |
|
Delamination problems?CI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Michelle Raigosa on Jul 19, 2010, 8:42 am
Has anyone had delamination issues (or any other performance related issues) with composite... Last reply: Maory Sciubba, LEED AP, Jul 26, 2010, 6:55 pm |
|
task lightingCI-2009 EAp2: Minimum Energy Performanceposted by Vivian Wan on Jul 19, 2010, 5:45 am
I am confused by the definition of "task lighting" as ASHRAE and LEED seem to have different intepretation of the term. ASHRAE 90.1-2007 section 9.2.2.3 states "Exceptions:...p) Furniture-... Last reply: Michael Smithing, Nov 11, 2013, 9:39 am |
|
STEP 7- Review contractor submittalsNC-2009 EAc3: Enhanced Commissioningposted by Fabio Frescia on Jul 19, 2010, 4:57 am
Dear all partner, Pls. can you clarify to me about the requirements of Review contractor submittals. Submittals here is included: material/ equipment AND Shop drawing? Or just material/... Last reply: Chris Ladner, Jul 27, 2010, 2:54 pm |
|
Trying to locate 2yr, 24hr rainfall info for Central AmericaLocating 2-year, 24-hour rainfall intensity values for EBOM SSc6posted by John Klein on Jul 18, 2010, 2:13 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11470 thumbs up July 27, 2010- 12:24 pm Michelle, may I suggest that you re-post this question to the NC SSc6.1 forum? You might have better luck there with people working on this credit seeing your question. Log in or register to post comments Meghan Ward Architectural Technologist, Sustainable Design Consultant Aurecon South Africa LEEDuser Basic Member 10 thumbs up January 29, 2015- 7:31 am Hi Samantha, Did you manage to figure out the solution to your above dilemma? We are facing the same dilemma with a project... Last reply: Meghan Ward, Jan 29, 2015, 7:31 am |
|
Metering FaucetsCI-2009 WEc1: Water Use Reductionposted by Gahl Sorkin Spanier on Jul 18, 2010, 12:06 pm
The credit guidelines indicate that metering faucets are limited to .25 gallons per use. This is the typical use of a metered faucets less than that would typically not wash your hands, to be... Last reply: Carl Sherman, Nov 16, 2010, 10:25 am |
|
ASHRAE- LPD limitsNC-2009 EAp2: Minimum Energy Performanceposted by Rosana Correa on Jul 16, 2010, 4:29 pm
In one of our projects, we have closed large areas with ceiling height of 95 ft. It is very difficult to illuminate these environments properly according to the boundaries of ASHRAE. The... Last reply: Christopher Schaffner, Jul 19, 2010, 8:40 pm |
|
Synthetic Gymnasium FlooringNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Keith Robertson on Jul 16, 2010, 3:40 pm
We have a project that uses a seamless site-installed pulyurethane product for a gymnasium floor. (Pulastic or Elastiplus are two tradenames.) We are trying to establish whether they would be... Last reply: Reinhard Oppl, Feb 2, 2011, 3:39 am |
|
Process Load-Can I call my computer room units a process load?NC-2009 EAc1: Optimize Energy Performanceposted by John Harrington on Jul 16, 2010, 1:45 pm
I have a Liebert Computer Room Unit (DX System) it has a capacity of 137.8 MBH. It has a low efficiency (8.2 EER), the min efficiency listed on the 90/1-2007 TABLE 6.8.1B is 10.6 EER.... Last reply: Christopher Schaffner, Jul 19, 2010, 8:50 pm |