Small Buildings are Ineligible?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Abena Darden  on 

We've just heard interesting news via the GBCI "contact us" portal and we'd be interested in a reality check. Our building has four floors of roughly 5,000 sf each.

5
Default Avatar
Vice President
Thornton Tomasetti
LEEDuser Premium Member
188 thumbs up
Fri Apr 19, 2013, 6:08 pm

high savings in auxillary power

CS-2009 EAp2:Minimum Energy Performance
posted by  shashank jain  on 

Hi we are modelling a 18 storey office block in Sap Paulo and getting some results we wanted to cross check, as we doing the energy model for the first time... Description of the model: Our pro

5
Default Avatar
Environmental Analyst
BDSP Partnership
LEEDuser Basic Member
1 thumbs up
Fri Apr 19, 2013, 2:39 pm

Status of corridors/hallways for IEQp1

General forums
posted by  Wolfgang Werner  on 

I'm a bit confused about whether corridors/hallways are in or out?

5
Fri Apr 19, 2013, 12:43 am

Laundry detergent

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Patty Breech  on 

How does laundry detergent fit into this credit, if at all? If we should include it, how do we show that it's sustainable?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Apr 18, 2013, 11:21 pm

Changing project name

General forums
posted by  Shivani Langer  on 

Our project hasn't gone through any precertifications yet. The project was registered in one name but now the name has changed.

2
Thu Apr 18, 2013, 8:45 pm

Recycled Content & FSC Certified Wood Credits Grey Area

NC-2009 MRc7:Certified Wood
posted by  Roberto Meza  on 

We have the following case: We bought several door with the following characteristics according to the cut sheet: FSC Mixed 70% (new wood) and 85% pre-consumer recycled content. How do we documen

11
Thu Apr 18, 2013, 5:42 pm

One stop with 6 different rutes - Expemplary Performance

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Gabriela Hernández Castillo  on 

Our project is located on a heavily dense area and in one of the major streets. There is two bus stops that are within the .25 radius, but both bus stops are served by the same rutes.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Apr 18, 2013, 5:07 pm

Able to use a calculator other than USGBC's?

NC-2009 MRc4:Recycled Content
posted by  Andrew Tse  on 

Does GBCI now require sole use of USGBC's calculator for MRc3-7? Or is it allowing use of 3rd-party calculators such as from LEEDuser or GCs?

4
Thu Apr 18, 2013, 3:32 pm

Design Appeal - PI Forms

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Erika Duran  on 

I am submitting an appeal for IEQp1 and uploaded new Mechanical Schedules to the PIf4 form to demonstrate that the inconsistencies that were present were due to a design change.

4
Default Avatar
Dr.
Sustainability & Green Building Consultant
LEEDuser Basic Member
7 thumbs up
Thu Apr 18, 2013, 1:01 pm

Registered LEED project on Hold?

NC-2009 PIf2:Project Summary Details
posted by  Hugh Hagues  on 

Hi, my LEED project is registered and I understand I have a time limit to complete my LEED documentation & projects.

2
Thu Apr 18, 2013, 12:20 pm