WEp1- Substantial Completion Date

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by susan eguia on Jan 27, 2011, 5:51 pm

As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system. What if the "date" is unknown, doesn't show in...

Last reply: susan eguia, Feb 8, 2011, 7:23 pm

Services within a college campus

NC-2009 SSc2: Development Density and Community Connectivity
posted by Eri Spaulding on Feb 3, 2011, 2:28 pm

Project I am working on is located within a college campus. Can I count such as a chapel, cafeteria or library as a part of servcie even though they are within the campus? It seems that since it...

Last reply: Norma Lehman, Mar 27, 2012, 6:33 pm

Phase II

Schools-2009 SSp2: Environmental Site Assessment
posted by Terry Squyres on Feb 7, 2011, 9:38 am

If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?

Last reply: Donald Kaylor, Apr 14, 2011, 11:42 am

LEED CS two building complex

LEED Guidance for Campuses and Multiple Buildings
posted by Diego Prada on Apr 26, 2011, 1:09 pm

Hi,

We are working on certifying a two builiding project with LEED CS. These buildings share a common project boundary and parking areas. They are part of the same project and were...

Last reply: Tristan Roberts, Apr 26, 2011, 9:42 pm

Helipad

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Andy Rhoades on Apr 29, 2011, 11:45 am

Would a helipad be considered as an exclusion in the square footage count, similar to the mechanical equipment or solar panel?

Last reply: Jaida Anderson-Lozano, Feb 13, 2013, 1:22 am

Design Submittal- To do or not to do?

General forums
posted by Shannon Deeb on Apr 30, 2011, 12:19 pm

that are found in the BD&C Reference Guide Appendix 1. For energy modeling of those spaces see Appendix 2, and also the NC and CS 2009 EAp2 forums- there are some related comments there. Log in or register...

Last reply: Shannon Deeb, May 30, 2011, 10:02 am

applying for the Certification before or after the 10 months

CI-2009 EAc2: Enhanced Commissioning
posted by Carolina Vergnano on May 6, 2011, 8:45 am

My doubt is if it´s possible to Certificate a building with the Operation and Maintenance Manual made by the...

Last reply: Mauricio Ramirez, May 29, 2014, 9:13 pm

Furniture salvaged from site=Regional Mat+diverted Const. Waste?

Schools-2009 MRc5: Regional Materials
posted by Renee Shirey on May 18, 2011, 6:27 pm

We will be salvaging furniture from a school already on our site, but we are not going for MR3 (Mat. Reuse) due to the limited amount. However, we might possibly use it for MRc5 (understanding...

Last reply: Tiffany Moore, Apr 17, 2013, 10:46 am

No Fixtures Installed in Core & Shell Scope

CS-2009 WEp1: Water Use Reduction
posted by Lauren Ulmer on May 20, 2011, 11:09 am

From what I have read on this website, my understanding is that if we are not installing any plumbing fixtures as part of the Core & Shell work, then we must make the water reduction a...

Last reply: Curt Pascoe, May 27, 2011, 2:53 pm

Is Reused Wood Flooring Required to be Certified?

CI-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Nina Tallering on May 26, 2011, 9:04 pm

Is reclaimed...