WEp1- Substantial Completion DateEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on Jan 27, 2011, 5:51 pm
As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system. What if the "date" is unknown, doesn't show in... Last reply: susan eguia, Feb 8, 2011, 7:23 pm |
|
Services within a college campusNC-2009 SSc2: Development Density and Community Connectivityposted by Eri Spaulding on Feb 3, 2011, 2:28 pm
Project I am working on is located within a college campus. Can I count such as a chapel, cafeteria or library as a part of servcie even though they are within the campus? It seems that since it... Last reply: Norma Lehman, Mar 27, 2012, 6:33 pm |
|
Phase IISchools-2009 SSp2: Environmental Site Assessmentposted by Terry Squyres on Feb 7, 2011, 9:38 am
If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted? Last reply: Donald Kaylor, Apr 14, 2011, 11:42 am |
|
LEED CS two building complexLEED Guidance for Campuses and Multiple Buildingsposted by Diego Prada on Apr 26, 2011, 1:09 pm
Hi, We are working on certifying a two builiding project with LEED CS. These buildings share a common project boundary and parking areas. They are part of the same project and were... Last reply: Tristan Roberts, Apr 26, 2011, 9:42 pm |
|
HelipadEBOM-2009 SSc7.2: Heat island effect - roofposted by Andy Rhoades on Apr 29, 2011, 11:45 am
Would a helipad be considered as an exclusion in the square footage count, similar to the mechanical equipment or solar panel? Last reply: Jaida Anderson-Lozano, Feb 13, 2013, 1:22 am |
|
Design Submittal- To do or not to do?General forumsposted by Shannon Deeb on Apr 30, 2011, 12:19 pmthat are found in the BD&C Reference Guide Appendix 1. For energy modeling of those spaces see Appendix 2, and also the NC and CS 2009 EAp2 forums- there are some related comments there. Log in or register... Last reply: Shannon Deeb, May 30, 2011, 10:02 am |
|
applying for the Certification before or after the 10 monthsCI-2009 EAc2: Enhanced Commissioningposted by Carolina Vergnano on May 6, 2011, 8:45 am
My doubt is if it´s possible to Certificate a building with the Operation and Maintenance Manual made by the... Last reply: Mauricio Ramirez, May 29, 2014, 9:13 pm |
|
Furniture salvaged from site=Regional Mat+diverted Const. Waste?Schools-2009 MRc5: Regional Materialsposted by Renee Shirey on May 18, 2011, 6:27 pm
We will be salvaging furniture from a school already on our site, but we are not going for MR3 (Mat. Reuse) due to the limited amount. However, we might possibly use it for MRc5 (understanding... Last reply: Tiffany Moore, Apr 17, 2013, 10:46 am |
|
No Fixtures Installed in Core & Shell ScopeCS-2009 WEp1: Water Use Reductionposted by Lauren Ulmer on May 20, 2011, 11:09 am
From what I have read on this website, my understanding is that if we are not installing any plumbing fixtures as part of the Core & Shell work, then we must make the water reduction a... Last reply: Curt Pascoe, May 27, 2011, 2:53 pm |
|
Is Reused Wood Flooring Required to be Certified?CI-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Nina Tallering on May 26, 2011, 9:04 pm
Is reclaimed... Last reply: Lauren Sparandara, Jan 27, 2012, 3:40 pm |