Forum quick links
Project registered as CS2009 but developer just sold 70%
posted by Sonia M. Miranda Palacios on
Hi all. I am working in a project that is currently registered as LEED CS 2009.
unit (cf/storm)
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Ameet AA on
My project is using Option 1: Design stroms,Case 2 :Site with existing imperviousness mote than 50% LEED online template V 5.0 Table 6.1-3 Site runoff: Two year,24 hour Design storm quantity is r
CI for retail?
posted by Jan Hesse on
The CI - Reference Guide says under chapter II. that LEED 2009 for Commercial Interiors also addresses retail.
ablution fixture
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Erin Holdenried on
I assume an ablution fixture used to wash before entering a prayer room would have to be considered in the water use calculations. What would the baseline rate of the fixture be?
Using EBOM MRc8 as a LEED-NC ID Credit
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by Susan Di Giulio on
We have suggested that our client for a tech-intensive LEED-NC office project use E-waste recycling for an ID credit.
LEED v4 Voting
posted by Peggy White on
Hello - Does a 'abstain' vote on the LEED v4 ballot contribute to the quorum count?
Meeting GIBp2 and GIBp3 in mixed uUse Buildings not fully leased
posted by Marc Mondor on
Our project will certify buildings under mid rise LEED for Homes using ASHRAE 90.1 Appendex G energy modeling to demonstrate an average 10% improvement in energy efficiency.
Non-US Green-E Available?
CS-2009 EAc6:Green Powerposted by Yoyo Shek on
Do anyone know if the Green-E supplier is limited in US?
LEED EB or NC?
posted by Elke Malleier on
We are building a considerable extension with new production lines to an existing manufacturing plant built in 1984, that has no LEED certification.
Definition of offices
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Ron Dean on
Hi, I want to know in the case that the building owner will rent all building offices, and design plans have a projected plant design free (without Closings) but the internal regulations of tenant