walk-off mats

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Christine Teichert  on 

We are about to submit for our desgin review and are wondering if exits used soley for egress and accesibility only can be exempt from the need for a walk-off mat.

5
Wed Jul 17, 2013, 3:08 pm

District hot water

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Anna Korinkova  on 

Hi all LEEDusers, has anybody experienced a project supplied by district hot water but the units were in kWh?

3
Wed Jul 17, 2013, 3:04 pm

Proposed ERV vs. Baseline VAV

NC-2009 EAp2:Minimum Energy Performance
posted by  Laura Long  on 

I have a question regarding G3.1.2.8. Per this section a return fan is required for the baseline system if there is a return fan in the proposed model.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Jul 17, 2013, 3:04 pm

Fan power BaseLine

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

Hello everybody, I´m simulating a LEED Project. When calculating the powers of the fans as G3.1.2.9, the result is adequate.

5
Green Building Energy Consultant
Green Living Projects
LEEDuser Basic Member
2 thumbs up
Wed Jul 17, 2013, 12:55 pm
5
Owner
Watkins Design Works, LLC
LEEDuser Premium Member
6 thumbs up
Tue Jul 16, 2013, 8:58 pm

Option 2 for site that is partially zero-irrigation

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Lyle Axelarris  on 

Some portions of the site are irrigated, while other areas are not. Non-irrigated areas include adapted grass,shrubs and trees which are shaded by the building and do not need irrigation.

4
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Tue Jul 16, 2013, 6:03 pm

Boiler efficiency

CS-2009 EAp2:Minimum Energy Performance
posted by  Mike D  on 

Hi, For the modelling input, should we use gross efficiency of the boiler or net efficiency? We tried to check what ASHRAE uses as a baseline but could not find anything. Many thanks!

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jul 16, 2013, 3:44 pm

M&V

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Florinda Garcia   on 

i am participating in a CS project, the building is a comercial office building all the office space will be for tenants.

3
Tue Jul 16, 2013, 2:37 pm

U-factor for fenestration in the Proposed Model

CS-2009 EAp2:Minimum Energy Performance
posted by  Ron Dean  on 

Hello everyone, I'm in the process of filling out the table 1.4 for LEED EAp2 submission, my question is about this ''How were the Proposed case framed assembly fenestration U-factors determined?'

5
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Tue Jul 16, 2013, 1:34 pm
2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Jul 15, 2013, 8:05 pm