walk-off mats
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Christine Teichert on
We are about to submit for our desgin review and are wondering if exits used soley for egress and accesibility only can be exempt from the need for a walk-off mat.
District hot water
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Anna Korinkova on
Hi all LEEDusers, has anybody experienced a project supplied by district hot water but the units were in kWh?
Proposed ERV vs. Baseline VAV
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Long on
I have a question regarding G3.1.2.8. Per this section a return fan is required for the baseline system if there is a return fan in the proposed model.
Fan power BaseLine
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello everybody, I´m simulating a LEED Project. When calculating the powers of the fans as G3.1.2.9, the result is adequate.
Option 2 for site that is partially zero-irrigation
EBOM-2009 WEc3:Water Efficient Landscapingposted by Lyle Axelarris on
Some portions of the site are irrigated, while other areas are not. Non-irrigated areas include adapted grass,shrubs and trees which are shaded by the building and do not need irrigation.
Boiler efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Mike D on
Hi, For the modelling input, should we use gross efficiency of the boiler or net efficiency? We tried to check what ASHRAE uses as a baseline but could not find anything. Many thanks!
M&V
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Florinda Garcia on
i am participating in a CS project, the building is a comercial office building all the office space will be for tenants.
U-factor for fenestration in the Proposed Model
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hello everyone, I'm in the process of filling out the table 1.4 for LEED EAp2 submission, my question is about this ''How were the Proposed case framed assembly fenestration U-factors determined?'
CxA qualification?
CI-2009 EAc2:Enhanced Commissioningposted by Torsten Biernat on
We have a project (