Single User Group, Partial Fixture Renovations, Usage Inequality

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Joanne Jackson on Jan 24, 2011, 1:37 pm

My question is 2-fold:
We're trying to complete the WEp1 form using a single fixture group (office) for a pre-1993 commercial office hi-rise. The hi-rise has 37 floors with the same usage...

Last reply: Jason Franken, Feb 21, 2011, 10:57 am

Latest a CxA can be brought into project

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Judy Peterson on Feb 16, 2011, 10:44 am

My client was late in committing to LEED for an interior renovation, so is this prerequisite achievable if...

Last reply: Jan Wei, Feb 19, 2011, 9:55 am

No Manufacturer and No Model Name.

EBOM-2009 EAp3: Fundamental Refrigerant Management
posted by Simon Sue on Feb 18, 2011, 4:20 am

Our project is a multi tenant space and consist few restaurant. we unable to identify the manufacturer and model name of the refrigerator but we able to know the type of refrigerant used. in LEED...

Last reply: Kimberly Frith, Feb 18, 2011, 2:33 pm

Documentation Requirements

CS-2009 MRc1: Building reuse - maintain existing walls, floors and roof
posted by Robyn Williams Heeks on Feb 14, 2011, 4:35 pm

In the LEED User documentation toolkit they describe using elevations to verify the exisiting / new calculations. I can see how these would be necessary for calculating surface areas, but as...

Last reply: Kimberly Frith, Feb 18, 2011, 2:29 pm

"mixed submittal" for EQ pre 3?

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Candice Groves on Feb 11, 2011, 12:23 pm

Curious if anyone has submitted a "mixed submittal" before either during the regular LEED submissions or during an appeal?

The project we're working on - some of the spaces comply with...

Last reply: Daniel Hicks, Feb 18, 2011, 11:27 am

Exceptions for Floodlights

NC-2009 EAp2: Minimum Energy Performance
posted by Tatjana Ernst on Jan 26, 2011, 9:12 am

Hi everyone,

i have a question regarding the Floodlights in a soccer station. I understand that in accordance with ASHRAE 90.1 9.4.5 the Floodlights (e. Lighting for athletic playing...

Last reply: Jean Marais, Feb 18, 2011, 11:26 am

How to include cost associated with rare building cleaning?

EBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materials
posted by Paul C on Feb 17, 2011, 1:38 pm

This relates to a questioned I posed on the IEQ cleaning equipment forum in regards to where to draw the line. Fro the cleaning equipment forum I was told to include ALL equipment including...

Last reply: Jason Franken, Feb 18, 2011, 10:45 am

Energy model w/ air filtration

NC-2009 EAc1: Optimize Energy Performance
posted by Eri Spaulding on Jan 4, 2011, 12:02 pm

Currently I am working on laboratory building and pursuing points for EAc1 Optimize Energy Performance. During the design phase, my team and mechanical consultant made an attempt at energy...

Last reply: Marcus Sheffer, Feb 18, 2011, 9:11 am

Irrigation supply from local farmland irrigation channel

NC-2009 WEc1: Water Efficient Landscaping
posted by Jorng-ren Chern on Nov 2, 2010, 12:18 am

The project is planning to irrigate the planting area from an open water channel outside the project boundary. The function of the channel is to supply water for farmland irrigation and receive...

Last reply: Tristan Roberts, Feb 18, 2011, 3:06 am

Reduction of the process load.

NC-2009 EAp2: Minimum Energy Performance
posted by Rodrigo Perez on Jan 24, 2011, 9:10 am

We're working in certification for an hotel, it has the process load (swimming pool, elevators, refrigerators equipment, etc) which can be reduced, for example, can be used the heat rejection...

Last reply: Tristan Roberts, Feb 18, 2011, 2:31 am