Topic | Recent |
---|---|
Pesticides not listed in 2007 San Francisco ListEBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest managementposted by Yong Lee Low on Jun 24, 2010, 4:30 am
Most of the chemicals being used for my project are not listed in the 2007 San Francisco Reduced-Risk Pesticide List.Does it mean that the credit cannot be achieved or if we are issuing the... Last reply: Shira Norman, Jun 25, 2010, 12:36 pm |
|
Prescriptive Method QuestionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Melissa Wrolstad on Sep 25, 2009, 9:59 am
1.) In the Sample Prescriptive Compliance Method and Plan document, it depicts a room divided up into 3 bays. What is the purpose of dividing the room into 3 bays? Wouldn't the results be the... Last reply: Seema Pandya, Jun 25, 2010, 11:33 am |
|
§ 6.4, Meet the requirements i ASHRAENC-2009 EAp2: Minimum Energy Performanceposted by Lisa Håkansson on Jun 21, 2010, 3:35 am
Hi! In the form for HVAC, part 2, § 6.4 system worksheet, contains the mandatory requirements for HVAC... Last reply: Christopher Schaffner, Jun 25, 2010, 10:21 am |
|
SSc1 Option 2 Paths as EP in IDc1CI-2009 IDc1: Innovation in Designposted by Victoria Lockhart on Jun 22, 2010, 1:37 pm
Can Paths from SSc1 of the LEED CI Rating System Option 2 that were not "cashed in" as part of SSc1 be pursued as EP in ID? In particular, Path 6 Light Pollution omits the requirements on... Last reply: Tristan Roberts, Jun 24, 2010, 11:21 pm |
|
Local Accredited LaboratoriesSchools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Carmelito Tatlonghari on Jun 12, 2010, 3:48 am
I am doing LEED Registered Projects in the Philippines. Last reply: Tristan Roberts, Jun 24, 2010, 11:15 pm |
|
Low emitting materials in CS 2.0CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by javier bolanos zeledon on Jun 24, 2010, 10:18 pm
Regarding low emitting materials such us solvents, adhesives, carpets, in CS2.0. Can I put just one compliant door for example and still get that credit. It is my understanding that CS 2.0 does... Last reply: Tristan Roberts, Jun 24, 2010, 10:41 pm |
|
narrow it downGeneral forumsposted by Tristan Roberts on Jun 24, 2010, 10:33 pm
This is a pretty broad question. Can you narrow it down as far as what pieces you're less sure about? Also, there are so many different ways for a LEED consultant to be involved. Can you give... |
|
If we assume there's noGeneral forumsposted by David Posada on Jun 24, 2010, 5:58 pm
If we assume there's no guarantee the remaining 15% will be demolished, and presumably that space uses it's share of the... |
|
Determining Total Materials BudgetCI-2009 MRc3.1: Materials Reuseposted by Adolfo Silva on Jun 24, 2010, 3:22 pm
We are working on a CI project which has a significant amount of reused construction materials and furniture. Should we include the replacement cost or the actual cost of construction... Last reply: David Posada, Jun 24, 2010, 5:44 pm |
|
Conditions for LEED-CI vs. LEED-NCGeneral forumsposted by Tristan Roberts on Mar 16, 2010, 12:25 pm
We were just talking about rating system selection over on this thread, and USGBC's document that gives its policies for... Last reply: Brenden McEneaney, Jun 24, 2010, 1:25 pm |