Forum quick links
Insulation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Catalina Caballero on
Our project consist in a conversion from a warehouse to a university. but only part of the univeristy is being certified.
retail portion less than 10% of total SF in mixed-use building
NC-2009 PIf3:Occupant and Usage Dataposted by Courtney Royal on
According to Interpretation #10209, issued 7/1/2012, it says that if a non-residential SF of a mixed-used building is less than 10% or no greater than 5,000 SF, it is acceptable for the non-residen
Option 2: Insulation for Baseline and Proposed
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Under "LEED Project Submittal Tips: Commercial Interiors 2009", the guide is referencing to Table G3.1-5(F) when applicable for baseline and propose values consistent with Appendix A.
Enough for credit compliance
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Mathilda Jonsson on
Hi all! My CS project is an office building.
How do we qualify for offsite salvaged materials?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Katherine Ann Resurreccion on
Hello! Our client, (the project owner) has a branch office from another country wherein there are bulk of furniture which were transported 3 years ago to our recently registered LEED project.
IEQc4 Compliance for Sustainably Sourced Materials
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Catherine Blakemore on
So the first AND in this credits as follows: Wall, ceiling and flooring systems and finishes, composite wood, agrifiber and fiberglass products, both exterior and interior adhesives, sealants, coa
Mixed use meter
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alicia Villanueva on
We have a meter that measures: chiller + pump + lighting system. Since we are not discriminating by "end use": would this meter qualify towards this credit? Thanks GH
Shading Devices in Baselin - Option 2. Energy Model.
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Im a bit confused whether to use overhangs or not in the baseline of the energy model for option 2.
Ventilation through adjoining room
NC-2009 IEQp1:Minimum IAQ Performanceposted by LEED Pro Consultant on
Hello, Our project is a residential building and will have no mechanical ventilation in the apartments. For this case, LEED asks us to comply with ASHRAE 62.1-2007 paragraph 5.1.