Insulation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Catalina Caballero  on 

Our project consist in a conversion from a warehouse to a university. but only part of the univeristy is being certified.

4
Fri Aug 16, 2013, 12:51 pm

retail portion less than 10% of total SF in mixed-use building

NC-2009 PIf3:Occupant and Usage Data
posted by  Courtney Royal  on 

According to Interpretation #10209, issued 7/1/2012, it says that if a non-residential SF of a mixed-used building is less than 10% or no greater than 5,000 SF, it is acceptable for the non-residen

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Aug 15, 2013, 1:37 pm

Option 2: Insulation for Baseline and Proposed

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Under "LEED Project Submittal Tips: Commercial Interiors 2009", the guide is referencing to Table G3.1-5(F) when applicable for baseline and propose values consistent with Appendix A.

5
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Aug 15, 2013, 1:17 pm

Enough for credit compliance

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  Mathilda Jonsson  on 

Hi all! My CS project is an office building.

5
Thu Aug 15, 2013, 5:55 am

How do we qualify for offsite salvaged materials?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Katherine Ann Resurreccion  on 

Hello! Our client, (the project owner) has a branch office from another country wherein there are bulk of furniture which were transported 3 years ago to our recently registered LEED project.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 15, 2013, 2:19 am

IEQc4 Compliance for Sustainably Sourced Materials

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

So the first AND in this credits as follows: Wall, ceiling and flooring systems and finishes, composite wood, agrifiber and fiberglass products, both exterior and interior adhesives, sealants, coa

3
Wed Aug 14, 2013, 11:00 pm
4
Wed Aug 14, 2013, 10:25 pm

Mixed use meter

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Alicia Villanueva  on 

We have a meter that measures: chiller + pump + lighting system. Since we are not discriminating by "end use": would this meter qualify towards this credit? Thanks GH

5
Senior Tax Accountant
Ernst & Young
LEEDuser Basic Member
4 thumbs up
Wed Aug 14, 2013, 9:31 pm

Shading Devices in Baselin - Option 2. Energy Model.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Im a bit confused whether to use overhangs or not in the baseline of the energy model for option 2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 14, 2013, 7:19 pm

Ventilation through adjoining room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  LEED Pro Consultant  on 

Hello, Our project is a residential building and will have no mechanical ventilation in the apartments. For this case, LEED asks us to comply with ASHRAE 62.1-2007 paragraph 5.1.

2