Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Where can I find the VOC limits for sealants used as fillers?

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  yan lian  on 

Our review comments has one item, "Provide a revised plan that includes sustainability criteria for sealants used as fillers based on the requirements of BayArea Air Quality Management District Reg

6
Default Avatar
Director of Sustainability
DCS Design
LEEDuser Basic Member
6 thumbs up
Tue Aug 20, 2013, 12:38 am

Construction change will allow us to achieve credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ivy Glasgow  on 

NC 2009 project. Two problems. First, we were denied Credit WEc3 in Design phase re-submittal. This appeared to be because of a glitch in the way the online form calculates the credit.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Aug 19, 2013, 10:34 pm

LEED CI or EBOM First?

LEED Rating System Selection
posted by  Dale Dunnet  on 

We have a client who owns several buildings built 100+ years ago. He currently would like to remodel and certify the 4 office suites in one of the buildings under LEED CI.

3
Default Avatar
Design Coordinator
Miles Construction
LEEDuser Basic Member
0 thumbs up
Mon Aug 19, 2013, 10:13 pm

Older existing building - no VLT available

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Mike Stopka  on 

Has anyone else experienced this? We are doing a Commercial Interiors project in a building that was constructed in the 1950s.

3
Mon Aug 19, 2013, 7:54 pm
3
CEO
ECON Group
LEEDuser Basic Member
126 thumbs up
Mon Aug 19, 2013, 4:55 pm

Dual toilet flush rate average

NC-2009 WEc3:Water Use Reduction
posted by  Mike D  on 

If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c

2
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Mon Aug 19, 2013, 3:50 pm

Option 1, Equipment Efficiency - Reuse of Existing Equipment

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Tony Ricketts  on 

Hi all, I have a tenant fit-out project served by water source HPs.

3
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Fri Aug 16, 2013, 5:39 pm

Residential Default Fixture Uses

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Tomas Kurka  on 

Hi, I am working on LEED certification of hotel project.

2
Fri Aug 16, 2013, 4:16 pm

FSC Controlled?

NC-2009 MRc7:Certified Wood
posted by  Giselle Walsh  on 

I'm working with a manufacturer who has offered the wood in FSC Controlled or FSC Mixed. I can't find information on FSC Controlled on this page. Does that wood get full credit?

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Fri Aug 16, 2013, 4:07 pm

Ready made concrete elements

NC-2009 MRc4:Recycled Content
posted by  Lise Dannesboe  on 

Hej! Do ready made concrete elements that are delivered on site count as assembly while in concrete that is cast on site the concrete and steel are two materials? Thanks!

3
Sustainability Manager
COWI
LEEDuser Premium Member
54 thumbs up
Fri Aug 16, 2013, 2:15 pm