Retrocommissioning- Systems RequirementsEBOM-2009 EAc2.1: Existing building commissioning - investigation and analysisposted by Nate Eppley on Feb 14, 2011, 4:22 pm
I am working on a cultural center performance space in San Diego with very few HVAC system components. For ventilation, there are exhaust fans that induce outdoor air into the building through... Last reply: Pierce Holstrom, Feb 14, 2011, 7:19 pm |
|
Minimum number required by local zoning regsCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Patricia Ewanski on Jan 27, 2011, 11:18 pm
I'm not so savvy with how local zoning regs are worded. I did search for my city's local zoning regs and I'm not sure if what I found is it. Anyway, does this mean that a municipality will say... Last reply: Patricia Ewanski, Feb 14, 2011, 6:04 pm |
|
"Transport demand management strategies" for a retail mallNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Maya Karkour on Jan 19, 2011, 8:52 am
Dear all, The local area requirements for parking spaces of a retail mall is around 1974 cars and there are about 1833 car spaces at the moment, thus short of 141 cars. Any ideas of... Last reply: Larry Jones, Feb 14, 2011, 3:54 pm |
|
ADA Parking spaceNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Jeremy Knoll on Jan 21, 2011, 4:18 pm
I am working on a project which includes no new parking with the exception of 1 code-required handicap parking spot. How is this counted? Does it mean we automatically have to add a carpool space... Last reply: Larry Jones, Feb 14, 2011, 3:38 pm |
|
Pilot Credits in LEED 2009 for HealthcareNC-2009 IDc1: Innovation in Designposted by Amy Balderrama on Feb 14, 2011, 2:42 pm
There is some confusion around earning Innovation Points in LEED for Healthcare with pilot credits. Per the LEED for Healthcare rating system it is only possible to earn only one point with... Last reply: Tristan Roberts, Feb 14, 2011, 3:16 pm |
|
How to calculate Process Energy for CS?CS-2009 EAp2: Minimum Energy Performanceposted by Tatjana Ernst on Feb 9, 2011, 4:27 am
Hi everyone, we have an Core & Shell-Office Building. Last reply: Marcus Sheffer, Feb 14, 2011, 8:30 am |
|
Submersible & Booster Pumps: Process equipment?NC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Jan 31, 2011, 4:23 am
Dear all, Should I model non-HVAC pumps such as "sewage submersible pumps" and "domestic water booster pumps" as process equipment? Thanks! Last reply: David Hubka, Feb 14, 2011, 8:06 am |
|
European Certificates accepted?NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Nicole Isk on Feb 14, 2011, 6:04 am
Adhesives and... Last reply: Reinhard Oppl, Feb 14, 2011, 7:24 am |
|
mixed use building project (mainly residential)NC-2009 WEp1: Water Use Reductionposted by Tarek Dalati on Jan 29, 2011, 6:49 am
i m working on a mixed use building project (mainly residential) and i have the following question: Last reply: Karen Blust, Feb 12, 2011, 8:22 pm |
|
Min/Max Cooling/Heating air temperatures for ASHRAE 90.1NC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Jan 25, 2011, 6:46 am
Is there a minimum/maximum delivery air temperature that must be up held for ASHRAE 90.1 (we're not talking about thermal comfort, but energy simulation...the fan power specification as per Appx... Last reply: David Hubka, Feb 12, 2011, 12:39 pm |