Topic | Recent |
---|---|
minimum area of neighborhood required?NC-2009 SSc2: Development Density and Community Connectivityposted by Pete Larsen on May 26, 2010, 3:30 pm
The credit requires the site to be within 1/2 mile of a neighborhood with minimum 10 units per acre. Is there a minimum area of neighborhood required? For example, does 10% (or any particular... Last reply: Larry Jones, Feb 24, 2011, 1:50 pm |
|
LEED-ND vs. LEED-NC why would I choose to follow one and not theLEED Rating System Selectionposted by Andrew Slusser on Feb 22, 2011, 11:50 am
Hi Everyone, I am looking for some help if anyone has looked at the 2 rating Last reply: Allison Beer McKenzie, Feb 24, 2011, 1:20 pm |
|
Unit ClarificationCI-2009 SSc2: Development Density and Community Connectivityposted by Heather Eberhardt on Dec 6, 2010, 1:47 pm
I wanted to know if anyone could tell me how many units you need in a half a mile radius. I am a little confused on how to calculate the 10 units per acre. Last reply: Larry Jones, Feb 24, 2011, 12:19 pm |
|
continuation of multiple buildings conversationGeneral forumsposted by Joanna Jenkins on Feb 10, 2010, 10:01 am
Just to be clear, as we saying that multiple buildings must be registered separately- and, therefore, must pay separate registration and certification fees? This wil multiply the tracking and... Last reply: Tristan Roberts, Feb 24, 2011, 11:08 am |
|
Metallic Glaze that is LEED complaintNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Megan Bove on Feb 22, 2011, 7:54 am
In reviewing submittals with the painting trade on my project, we came across the specified a specified paint that we are looking for a substitute. The reason for this is the product does not... Last reply: Tristan Roberts, Feb 24, 2011, 10:52 am |
|
RE: LEED 2009 to AGMBC 2010 registrationLEED Guidance for Campuses and Multiple Buildingsposted by Katherine Ann Resurreccion on Jan 24, 2011, 12:35 am
My project is a Mixed-Use development. It consists of 3 residential condominium towers erecting on a single podium building, which will function as a mall. Currently this project is... Last reply: Tristan Roberts, Feb 24, 2011, 10:24 am |
|
Electric bicycles in AsiaNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Louise Schlatter on Jan 31, 2011, 1:48 pm
We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles. These are not... Last reply: Melissa Merryweather, Feb 24, 2011, 10:16 am |
|
Phased Occupancy and IAQ TestingCI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Melissa Wrolstad on Feb 22, 2011, 5:11 pm
I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction. Is it possible to split... Last reply: Susann Geithner, Feb 24, 2011, 9:53 am |
|
Cleaning contract for roll out matsCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by V. Miller on Feb 24, 2011, 12:56 am
LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided. However, the roll out mat section of the tempalte does not have an upload button, or... Last reply: Allison Beer McKenzie, Feb 24, 2011, 8:44 am |
|
Modeling the BaselineNC-2009 EAc1: Optimize Energy Performanceposted by Carolina Vergnano on Feb 22, 2011, 9:52 am
I've seen some discussion about the section G3.1.1 from ASHRAE 90.1-2007, but I still have some doubt about it. I'm working in a project that is a build-to-suit office building with 13... Last reply: David Hubka, Feb 24, 2011, 7:57 am |