minimum area of neighborhood required?

NC-2009 SSc2: Development Density and Community Connectivity
posted by Pete Larsen on May 26, 2010, 3:30 pm

The credit requires the site to be within 1/2 mile of a neighborhood with minimum 10 units per acre. Is there a minimum area of neighborhood required? For example, does 10% (or any particular...

Last reply: Larry Jones, Feb 24, 2011, 1:50 pm

LEED-ND vs. LEED-NC why would I choose to follow one and not the

LEED Rating System Selection
posted by Andrew Slusser on Feb 22, 2011, 11:50 am

Hi Everyone,

I am looking for some help if anyone has looked at the 2 rating
systems side by side. I am working with a company that is looking at
either certifying buildings...

Last reply: Allison Beer McKenzie, Feb 24, 2011, 1:20 pm

Unit Clarification

CI-2009 SSc2: Development Density and Community Connectivity
posted by Heather Eberhardt on Dec 6, 2010, 1:47 pm

I wanted to know if anyone could tell me how many units you need in a half a mile radius. I am a little confused on how to calculate the 10 units per acre.

Last reply: Larry Jones, Feb 24, 2011, 12:19 pm

continuation of multiple buildings conversation

General forums
posted by Joanna Jenkins on Feb 10, 2010, 10:01 am

Just to be clear, as we saying that multiple buildings must be registered separately- and, therefore, must pay separate registration and certification fees? This wil multiply the tracking and...

Last reply: Tristan Roberts, Feb 24, 2011, 11:08 am

Metallic Glaze that is LEED complaint

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Megan Bove on Feb 22, 2011, 7:54 am

In reviewing submittals with the painting trade on my project, we came across the specified a specified paint that we are looking for a substitute. The reason for this is the product does not...

Last reply: Tristan Roberts, Feb 24, 2011, 10:52 am

RE: LEED 2009 to AGMBC 2010 registration

LEED Guidance for Campuses and Multiple Buildings
posted by Katherine Ann Resurreccion on Jan 24, 2011, 12:35 am

My project is a Mixed-Use development. It consists of 3 residential condominium towers erecting on a single podium building, which will function as a mall.

Currently this project is...

Last reply: Tristan Roberts, Feb 24, 2011, 10:24 am

Electric bicycles in Asia

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Louise Schlatter on Jan 31, 2011, 1:48 pm

We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles. These are not...

Last reply: Melissa Merryweather, Feb 24, 2011, 10:16 am

Phased Occupancy and IAQ Testing

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Melissa Wrolstad on Feb 22, 2011, 5:11 pm

I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction. Is it possible to split...

Last reply: Susann Geithner, Feb 24, 2011, 9:53 am

Cleaning contract for roll out mats

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by V. Miller on Feb 24, 2011, 12:56 am

LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided. However, the roll out mat section of the tempalte does not have an upload button, or...

Last reply: Allison Beer McKenzie, Feb 24, 2011, 8:44 am

Modeling the Baseline

NC-2009 EAc1: Optimize Energy Performance
posted by Carolina Vergnano on Feb 22, 2011, 9:52 am

I've seen some discussion about the section G3.1.1 from ASHRAE 90.1-2007, but I still have some doubt about it.

I'm working in a project that is a build-to-suit office building with 13...

Last reply: David Hubka, Feb 24, 2011, 7:57 am