Log in
Forum
Topic

LEED NC for Most of a Building

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Nathan Gauthier on Mar 2, 2017, 1:24 pm

Does anybody have any thoughts on certifying an existing building undergoing a major renovation as LEED NC but excluding a relatively small portion of support space that is managed by a different...

Last reply: Joyce Kelly, May 31, 2017, 6:27 pm

Credit For Demolished Concrete for use as backfill

NC-v4 MRc5: Construction and demolition waste management
posted by Chad Van Drie on Feb 7, 2014, 4:11 pm

in not responding sooner. I somehow got unsubscribed from this forum. Several LEEDusers have gotten Project CIRs that indicate that the USGBC is not accepting commingled waste as multiple streams unless the facility...

Last reply: RETIRED, Feb 25, 2019, 6:33 pm

v4 Healthcare?

LEED Rating System Selection
posted by Rachel Manoguerra on Mar 17, 2017, 2:12 pm

I am apart of team that is trying to decide on which rating system to use. Our project is an Outpatient Medical Center. It is not for acute or long-term care.
Our client wants to pursue...

Last reply: Adam Musante, Mar 12, 2019, 12:02 pm

Homes v4, EA, Home Size, positive and negative points?

Homes-v4 EAp4: Home size
posted by Gary Wheeler on Mar 24, 2017, 4:48 pm

On the Excel spreadsheet from LEED, there is no space to put either positive or netative points. The line is shown with a "Y" box, is listed as "prereq." and there is no space listing the number...

Last reply: Carissa Sawyer, Jan 16, 2019, 5:42 pm

Baseline model for storage facility

Warehouses-NC-v4 EAc2: Optimize Energy Performance
posted by Jeremiah Crossett on Mar 24, 2017, 6:18 pm

Hi, I am working on a 5 story self storage building in Shoreline WA as the modeler. I am thinking to make the baseline building have cooling per ASHRAE 90.1 2010, but am unsure if that will fly,...

Last reply: Marcus Sheffer, Mar 26, 2017, 11:35 am

Gross area v. net area in PI Form 3 and IEQ8.1

NC-2009 PIf3: Occupant and Usage Data
posted by James Bell on Mar 30, 2017, 11:22 am

the right area totals across different credit forms in all circumstances drove the decision to abandon linked data fields in the latest (the v06) version of the credit forms. There are other forum threads...

Last reply: ebru unver, Jan 15, 2018, 5:20 am

Amtrak and Megabus

NC-v4 LTc5: Access to quality transit
posted by Sara Zoumbaris on Apr 10, 2017, 11:59 am

Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within...

Last reply: emily reese moody, Jan 16, 2018, 1:37 pm

Airflow monitoring in VAV systems

NC-v4 EQp1: Minimum indoor air quality performance
posted by Paula Rantanen on Apr 11, 2017, 3:35 am

Indirect measurements such as temperature or current transducers are not allowed for...

Last reply: Christoph Keck, May 13, 2022, 5:35 am

Partitioned office space clarification

WELL v1 Building Standard Tip Sheet
posted by Carina Clark on Apr 12, 2017, 6:36 pm

For WELL 80 SOUND REDUCING SURFACES, Part 2: Walls; c. Partitioned Office spaces:
Do these partitions need to surround the occupant on three sides, or, can it just be in front of the user?...

Last reply: Dionisio Franca, Jul 25, 2017, 1:37 am

Is water submetering required for LEED v3 2009?

NC-2009 EAc5: Measurement and Verification
posted by May Le on Apr 19, 2017, 12:56 pm

LEEDuser Expert 5903 thumbs up April 20, 2017- 11:48 am I was responding in the context of EAc5 since that is the forum the question was asked under. Yes for MPR #6 you provide energy and water data....

Last reply: Marcus Sheffer, Apr 20, 2017, 12:26 pm