Building Envelop Requirement on Manufacturing facilityNC-2009 EAp2: Minimum Energy Performanceposted by Xun Jia on May 10, 2012, 1:48 pm
I am working on a winery facility which includes office spaces and manufacturing spaces. Does LEED NC require the building envelop parameters (e.g. U-values, SC) of manufacturing parts of the... Last reply: Marcus Sheffer, May 16, 2012, 1:19 pm |
|
90.1-2007 PTHP minimum efficiency requirementsNC-2009 EAc1: Optimize Energy Performanceposted by TOMAS URIBE on May 11, 2012, 5:56 pm
Hello guys. I am modelling a hotel for LEED purpose. I need some help to chose the right table to calculate the Minimum Efficiency Requirements My system is package terminal heat... Last reply: Marcus Sheffer, May 23, 2012, 1:14 pm |
|
O1:Interior Lighting Power Density part of Mandatory Provisions?CS-2009 EAp2: Minimum Energy Performanceposted by Marco Abdallah on May 15, 2012, 8:18 am
We are pursueing OPTION 1 (Whole Building Simulation). Thus we also have to comply to the mandatory provisions, e.g. section 9.4 for lighting. Last reply: Marcus Sheffer, May 16, 2012, 9:14 am |
|
Building Area Method applicable for Multi-use-buildingCS-2009 EAp2: Minimum Energy Performanceposted by Marco Abdallah on May 15, 2012, 7:47 am
Assuming a 10 storey building where the first three floors are retail floors and the remaining 7 floors are office floors, is it generally possible to use the building area method? Last reply: Marcus Sheffer, Jun 4, 2012, 9:06 am |
|
MRc4.2 Copper Piping JointsLEED for Healthcare forumposted by Simon Sue on May 22, 2012, 2:53 am
Per the LEED reference guide and LEEDonline signatory, copper piping joints can only be one of the following: Last reply: Susan Walter, Jul 6, 2012, 4:39 pm |
|
iEQpr1 Operable awning windows for natural ventilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by LEED Pro Consultant on May 23, 2012, 5:53 pm
Hello, We have a building that is naturally ventilated and to comply with ASHRAE 62.1-2007 (prerrequisite) we are planning to place operable windows. We made the calculations to get the... Last reply: Nadia Ayala, Jul 22, 2014, 3:32 pm |
|
NFRC testNC-2009 EAp2: Minimum Energy Performanceposted by Jae Yong Park on May 24, 2012, 10:03 am
Hello. Last reply: Marcus Sheffer, Nov 19, 2012, 12:03 pm |
|
Option 2- The Performance Rating MethodCI-2009 EAc1.3: Optimize energy performance - HVACposted by Emma Eliasson on May 31, 2012, 8:53 am
Hi, LEED Reference Guide For Green Interior Design And Construction says in chapter EAc1.3 (# 6. Calculations) on p.168 that the standard has 2 energy comparison methods, both of which are... Last reply: Paula Hernandez, Mar 19, 2013, 1:56 pm |
|
Submit denied design phase credit for construction final reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Udana Ratnayake on May 31, 2012, 1:09 pm
in one of our projects prerequisite IEQp1 minimum indoor air quality performance was denied both in design preliminary review and final review. then we submitted it again after doing the required... Last reply: Tristan Roberts, Jul 1, 2012, 3:39 pm |
|
LEED GA and LEED AP exam changesGeneral forumsposted by Michael Zhang on Jun 1, 2012, 4:12 am
Hi Tristan Roberts- With the development and release of LEED 2012 in Nov. this year, i would like to know if the LEED GA&LEED AP exam will have significant changes and evolution, when... Last reply: Tristan Roberts, Mar 21, 2013, 3:22 pm |