Topic | Recent |
---|---|
Water Usage for parks and open spacesCS-2009 WEp1: Water Use Reductionposted by Deborah Lucking on Jun 10, 2016, 2:11 pm
Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users. |
|
40% WWR does it include the wall connected to other building?NC-2009 EAp2: Minimum Energy Performanceposted by Haojie Wang on Jun 14, 2016, 8:51 am
90.1 only says above grade wall, but if we have a wall that's directed connected to another building, should we also include those wall area in the calculation? The wall is using the same... |
|
O+M: Retail or ID+C: CILEED Rating System Selectionposted by Yulia Chen on Jun 14, 2016, 4:50 pm
Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011. Is it possible for us to go for Commercial Interior cert even though we missed... |
|
Base Case vs Project CaseCS-2009 EAp2: Minimum Energy Performanceposted by Dana Guzman on Jun 14, 2016, 6:19 pm
Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2? |
|
Onsite Recreation SpacePilot-Credits EQpc78: Design for active occupantsposted by Megan Recher on Jun 15, 2016, 6:44 pm
We are working on a new high school and I want to clarify the onsite recreation space. The credit says to "provide an onsite recreation space with exercise opportunities for both adults and... |
|
Local food productionPilot-Credits SSpc82: Local food productionposted by Lourdes Salinas on Jun 15, 2016, 7:48 pm
What is the best option of water irrigation systems for a small on site food production? |
|
LEED Rating System for tenant in existing buildingLEED Rating System Selectionposted by Jennifer Isaac on Jun 15, 2016, 10:08 pm
My client is a pharmaceutical facility that occupies part of the area of an existing building. The pharmaceutical facility space went into major renovations about 4 years ago and has been in... |
|
Reject Water from Reverse Osmosis system?NC-2009 WEc1: Water Efficient Landscapingposted by Eric Bautista on Jun 16, 2016, 4:31 am
Dear Fellow LEED Users, In the Irrigation Design Case tabulation, can I declare "reject water" from reverse osmosis equipment system of campus, as the source of non-potable water? ... |
|
What are the baseline conditions?EBOM-v4 SSc5: Site managementposted by Zachary Hayes on Jun 16, 2016, 4:05 pm
This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction? Is it suppose to read something along the... |
|
Thermal Comfort- Adaptive MethodNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Jun 17, 2016, 7:05 am
Dear All we are using (http://smap.cbe.berkeley.edu/comforttool) this link for thermal comfort results but we use PMV method for A/c... |