Automatic Receptacle Controls in 'open offices'NC-v4 EAp2: Minimum Energy Performanceposted by Kavita Karmarkar on Nov 29, 2018, 9:38 am
The following process load requirement for Automatic Receptacle controls mentions 'open office'. "At least 50% of all 125 volt 15 and 20 Amper receptacles installed in private offices,... Last reply: Kavita Karmarkar, Nov 29, 2018, 2:03 pm |
|
Demolition of existing buildingNC-v4 MRc5: Construction and demolition waste managementposted by Erik Heck on Nov 29, 2018, 11:45 am
We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5... Last reply: Linda Davisson, Sep 27, 2021, 5:19 pm |
|
Comingled waste on site- separation at waste facilityCS-v4 MRc5: Construction and demolition waste managementposted by Alicia Ravetto on Nov 29, 2018, 1:14 pm
Is this always considered a single stream? What method of documentation should the waste facility provide to comply with the requirement of this credit? Last reply: Richard Metts, Oct 3, 2019, 5:31 pm |
|
Entryway systems in airportsNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Ricardo Sá on Nov 30, 2018, 4:58 amhttps://leeduser.buildinggreen.com/forum/regularly-used-exterior-entrance Log in or register to post comments David Posada Integrated Design & LEED Specialist SERA Architects LEEDuser Expert 1980 thumbs up August 30, 2019- 2:41 pm I agree with Allan that any entries... Last reply: David Posada, Aug 30, 2019, 2:41 pm |
|
Option 5- 50% recyclable content by costCI-v4 MRc2: Interiors life-cycle impact reductionposted by Anna McGee on Dec 4, 2018, 5:10 pm
How does one prove that "... at least 50% of nonstructural materials, by cost, are reusable or recyclable, as defined by the Federal Trade Commission Guide for Use of Environmental Marketing... Last reply: Aleksandra Prawda, Dec 11, 2020, 8:13 am |
|
Fixed costsNC-v4 EAp2: Minimum Energy Performanceposted by Justyna Gładysz on Dec 6, 2018, 10:53 am
Hi everyone, Should we include fixed costs in calculating the costs of energy consumption? Fixed costs are in $ / kW, and variable costs are in $ /... Last reply: Justyna Gładysz, Dec 7, 2018, 10:36 am |
|
Construction Work Area DepressurizationNC-v4 EQc3: Construction indoor air quality management planposted by Danilo Ilic on Dec 12, 2018, 3:37 am
Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas) was... Last reply: Danilo Ilic, Dec 19, 2018, 4:25 am |
|
20% or more of the design teamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Shanwen Hsu on Dec 12, 2018, 3:28 pm
My project is pursuing option 2 There are several companies on the design team are JUST certified and are able to provide GRI G4 report as well as GRESB. My question is, if the dollar ... Last reply: Lauren Leatherbarrow, Jul 27, 2022, 5:26 pm |
|
LEED Boundary vs. Property Line vs. Limit of DisturbanceNC-v4 MPR2: Must use reasonable LEED boundariesposted by H Leinbach on Dec 13, 2018, 6:38 pm
I'm not sure where to establish the LEED Boundary for our site, we would prefer it be on the property line because it helps us out with open space credits. However, the limit of disturbance is... Last reply: Erica Downs, Feb 7, 2019, 11:14 am |
|
New calculator- cutsheets provided?NC-2009 MRc4: Recycled Contentposted by Ines Fischer on Dec 14, 2018, 2:15 pm
Hi all! I am new at the LEED community and I need some help. I have downloaded the last materials calculator and I see there´s no space for cutsheets anymore. Does this... Last reply: Dustin Norton, Dec 14, 2018, 4:51 pm |