Topic | Recent |
---|---|
Purchasing RECS after the Performance PeriodEBOM-2009 EAc4: On-Site and Off-Site Renewable Energyposted by Summer Gorder on Mar 11, 2014, 5:12 pm
Based on our reviewer clarifications, we are needing to take a different tactic to meet our goal. Can Offsite Green Power be purchased after the performance period as long as it accounts for that... |
|
Controller EfficiencyNC-2009 WEc1: Water Efficient Landscapingposted by Scott Fornaciari on Mar 12, 2014, 7:01 pm
How do I calculate controller efficiency. I am using a Rainmaster-i Eagle with central control, on-site weather station, rain sensor, flow sensor and master valve. |
|
Insulating Concrete FormsPilot-Credits PC20: Recycled Contentposted by AMY VAN DAM on Mar 13, 2014, 1:04 pm
Our project is using insulating concrete forms (ICFs) for the wall... |
|
Certified Green Seal vs Certified Green Seal GS37 or GS40EBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materialsposted by Fred Smith on Mar 13, 2014, 1:36 pm
In regards to the chemical products that we are currently using, I have found that several of them are Green Seal certified, but not the GS37 or the GS40. |
|
Community Connectivity travel distanceNC-2009 SSc2: Development Density and Community Connectivityposted by Jennifer Rennick on Mar 17, 2014, 2:50 pm
I am documenting basic services within a 1/2 mile radius of a project, however within the radius is a large body of water (river port). There are only 9 services close to the project on the near... |
|
AGMBC: Multiple Building and On-Campus ProjectsCS-2009 MPR2: Must be a complete, permanent building or spaceposted by Tam Kin Hung on Mar 19, 2014, 4:28 am
Project brief: |
|
Precertification in LEED-CS v4General forumsposted by Nándor Kovács on Mar 19, 2014, 4:56 am
Hello, Is there any information available about precertification process in LEED-CS v4? |
|
Calculating Hazardous Glass AreaPilot-Credits SSpc55: Bird collision deterrenceposted by ray keane on Mar 20, 2014, 12:31 pm
How is the Hazardous Glass Area (HGA) calculated for each material? Is a material with a higher threat factor weighted the same as a material with a lower threat factor? And do you include the... |
|
2 separate CI spaces, 1 project?CI-2009 MPR2: Must be a complete, permanent building or spaceposted by Charles Nepps on Mar 22, 2014, 1:53 pm
I am working on a project where we are doing TI work on two different flloors, of the same building, for the same tenant. Can this be treated as 1 project for CI 2009 certification purposes? |
|
LEED NC- Project BoundaryHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by sompoche sirichote on Mar 24, 2014, 5:25 am
We are working on a project that consists of 2 buildings: office building and workshop building. The owner wants to certify only the office building. The land is all owned by the same... |