We are working on a project that consists of 2 buildings: office building and workshop building. The owner wants to certify only the office building.

The land is all owned by the same entity and there is no property line to divide the 2 buildings. The buildings have a shared parking lot, pedestrian hardscape, roadways around the buildings, and utilities area (with separate meters).

Can we draw a boundary line directly through the pedestrian hardscape where the office is separated from the workshop? If so, how should we include the shared parking lot, hardscape, utilities area in the LEED project boundary?

Thank you.