Topic | Recent |
---|---|
Building Envelope CommissioningHealthcare-v2009 EAc3: Enhanced Commissioningposted by Kerrie Racicot on Nov 13, 2013, 8:28 am
BECx can be wide open when it comes to scope. |
|
mercury in specialty lamps (animal care)EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lampsposted by Saju Varghese on Nov 13, 2013, 5:26 pm
We are having an issue because some animal care lamps of our project do not really disclose the mercury content of the lamps since they consider it as some part of their copyright of some sort.... |
|
Eligibility for bicycle networkPilot-Credits PC30: Alternative Transportationposted by Chris Wittig on Nov 15, 2013, 5:37 pm
We recently completed a single family custom home in Kailua, Hawaii, fortunately this town promotes a great... |
|
Construction Waste Management SignsNC-2009 MRc2: Construction Waste Managementposted by Todd Hager on Nov 17, 2013, 10:51 am
The signs need to be in both English and Spanish to be effective in separating the materials. |
|
Handicapped toilet and Pedal-type toilet flush valveCI-2009 WEp1: Water Use Reductionposted by Shirley Li on Dec 23, 2013, 6:23 am
Hi all, |
|
Approval of BMPs not fully installedNC-2009 SSc6.2: Stormwater design - quality controlposted by Rob Watson on Dec 23, 2013, 4:05 pm
We have a client in a far northern climate that wants to achieve additional credit by installing rain gardens to handle runoff during the summer rainy season. They will not be able to begin... |
|
LEED CS, do all techn. systems need to meet the requirements?LEED Rating System Selectionposted by Torsten Biernat on Dec 26, 2013, 3:35 pm
An office building is undergoing a renovation of all tenant areas, including some of the overall techn. systems, see list below. |
|
District / Campus Energy- Modeling Option 2 (Full accounting)NC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Dec 27, 2013, 11:26 am
Dear All, I am intending to model a building on campus which is connected to a campus energy system providing chilled water and hot water. As I would like to achieve more points and I know... |
|
Prerequisites for campus projectsLEED Guidance for Campuses and Multiple Buildingsposted by Crina Bosch on Dec 31, 2013, 11:40 am
I am working on a campus project that will have two distinct buildings - an office building and a hotel with an attached convention center. I have concerns with how to document certain building... |
|
proceed to post-certification on master site application?LEED Guidance for Campuses and Multiple Buildingsposted by KIMBERLY KRAFT on Jan 2, 2014, 3:17 pm
I have a Master Site application that is currently in Design and Construction application decision. When I go to the “Overview” tab in LEED Online, I have (4) button options, one of which is “... |