Building Envelope Commissioning

Healthcare-v2009 EAc3: Enhanced Commissioning
posted by Kerrie Racicot on Nov 13, 2013, 8:28 am

BECx can be wide open when it comes to scope.
Is there some guidance regarding the scope that LEED is looking for?
Thank you,

mercury in specialty lamps (animal care)

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Saju Varghese on Nov 13, 2013, 5:26 pm

We are having an issue because some animal care lamps of our project do not really disclose the mercury content of the lamps since they consider it as some part of their copyright of some sort....

Eligibility for bicycle network

Pilot-Credits PC30: Alternative Transportation
posted by Chris Wittig on Nov 15, 2013, 5:37 pm

We recently completed a single family custom home in Kailua, Hawaii, fortunately this town promotes a great...

Construction Waste Management Signs

NC-2009 MRc2: Construction Waste Management
posted by Todd Hager on Nov 17, 2013, 10:51 am

The signs need to be in both English and Spanish to be effective in separating the materials.

Handicapped toilet and Pedal-type toilet flush valve

CI-2009 WEp1: Water Use Reduction
posted by Shirley Li on Dec 23, 2013, 6:23 am

Hi all,
We are working on a renovation office project, with fixtures located outside of tenant space. There are 2 restrooms loacated at public core area, one for Female, another one for...

Approval of BMPs not fully installed

NC-2009 SSc6.2: Stormwater design - quality control
posted by Rob Watson on Dec 23, 2013, 4:05 pm

We have a client in a far northern climate that wants to achieve additional credit by installing rain gardens to handle runoff during the summer rainy season. They will not be able to begin...

LEED CS, do all techn. systems need to meet the requirements?

LEED Rating System Selection
posted by Torsten Biernat on Dec 26, 2013, 3:35 pm

An office building is undergoing a renovation of all tenant areas, including some of the overall techn. systems, see list below.
The project team wants to use Major Renovation / CS. Can...

District / Campus Energy- Modeling Option 2 (Full accounting)

NC-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Dec 27, 2013, 11:26 am

Dear All,

I am intending to model a building on campus which is connected to a campus energy system providing chilled water and hot water. As I would like to achieve more points and I know...

Prerequisites for campus projects

LEED Guidance for Campuses and Multiple Buildings
posted by Crina Bosch on Dec 31, 2013, 11:40 am

I am working on a campus project that will have two distinct buildings - an office building and a hotel with an attached convention center. I have concerns with how to document certain building...

proceed to post-certification on master site application?

LEED Guidance for Campuses and Multiple Buildings
posted by KIMBERLY KRAFT on Jan 2, 2014, 3:17 pm

I have a Master Site application that is currently in Design and Construction application decision. When I go to the “Overview” tab in LEED Online, I have (4) button options, one of which is “...