Tracking energy consumption through the performance periodEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by gwenedd murray on May 16, 2011, 9:12 am
I understand the 12 mos tracking time period can start before the performance period begins but it must also include the performance period. What if your project's performance period is longer... Last reply: Hannah Bronfman, Oct 5, 2011, 1:24 pm |
|
CalculatorEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Austin Evans on Jul 7, 2011, 4:50 pm
In the Case 2 Option 2 tab for the offline calculator the cells are locked up on the option III enter current year EUI score as far as I can tell. I have downloaded the calculator from USGBC and... Last reply: Hannah Bronfman, Oct 5, 2011, 11:41 am |
|
Case 1 vs. Case 2 and dimming versus A/VSchools-2009 IEQc6.1: Controllability of systems - lightingposted by David Mirabile on Oct 5, 2011, 10:03 am
OK, I am still a little confused based on some of the comments below, but to me it is 100% clear just by the template alone that it is an either/or and not both. That is definitely diffrent than... Last reply: David Mirabile, Oct 5, 2011, 11:32 am |
|
Expiring Energy Star Rating and Eligibility for LEEDEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Nelina Loiselle on Aug 11, 2011, 4:12 pm
I have a large high rise with a data center in it. It's last Energy Star rating was September 2010. This year, I am not going to qualify for an Energy Star rating for two reasons: (1) we have had... Last reply: Hannah Bronfman, Oct 5, 2011, 11:26 am |
|
Zones, bay floor areaSchools-2009 IEQc8.1: Daylight and views - daylightposted by Felix Hunziker on Sep 23, 2011, 4:10 pm
Trying to use Option 2 and I'm confused about Zone Floor Area in the spreadsheet. Isn't the ZFA for sidelighting the same as the... Last reply: David Posada, Oct 4, 2011, 2:01 pm |
|
Metering and SubmeteringCI-2009 EAc3: Measurement and Verificationposted by Steve Khouw on Oct 20, 2010, 1:35 pm
We are still confused between the two. Correct me if I am wrong. Metering means installing an electricity (and water meter) device that record consumption for the entire project (or whole tenancy... Last reply: Ralf Lehmann, Oct 4, 2011, 10:52 am |
|
Como sustentar el Light trespass?CS-2009 SSc8: Light Pollution Reductionposted by ANGELICA MARIA GRANADOS LEAL on Oct 4, 2011, 9:25 am
Estamos realizando la documentación que se requiere pasa sustentar el credito SSc8. El proyecto que diseñamos es un hotel ubicado una zona Rural con vegetación virgen alrededor. Ya tenemos... |
|
flag lightsPilot-Credits SSpc7: Light Pollution Reductionposted by Bill Swanson on Mar 4, 2011, 1:07 pm
I was just thinking. If this Credit allows us to exclude adversiment lighting and theme park lighting why is it so difficult to exclude flag lighting. It just sends such a bad message. ... Last reply: Bill Swanson, Oct 4, 2011, 9:06 am |
|
heating load unmet hoursNC-2009 EAc1: Optimize Energy Performanceposted by Razan Nejem on Oct 3, 2011, 2:37 amunoccupied periods. At least that is our experience but we use eQUEST. Check out the HAP Users forum at http://onebuilding.org/ Log in or register to post comments ... Last reply: Marcus Sheffer, Oct 4, 2011, 8:05 am |
|
Alen A350 air purifierGeneral forumsposted by Tristan Roberts on May 19, 2010, 6:18 pm