Topic | Recent |
---|---|
Alkalia resistant bituminous paint for isolation coatingCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by James Emery on Aug 1, 2013, 8:32 pm
I am unclear where this type of paint fits within the product types listed in Table 1 for applicable... Last reply: James Emery, Aug 29, 2013, 6:22 pm |
|
Medical SuppliesEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Aurélie Kazour on Aug 2, 2013, 5:16 amclarity from this v3 forum since there has been so much discussion on the topic. I'll also post on the the v4 forum. Thank you! Log in or register to post comments ... Last reply: Michelle DiPenti, Oct 27, 2014, 4:09 pm |
|
Master site credits applicabiltyLEED Guidance for Campuses and Multiple Buildingsposted by Marcio Alberto Casado Pereira on Aug 2, 2013, 11:02 am
We have a campus with 9 buildings elegible to seek LEED but only some of them will seek the certification (we are still deciding which ones). I have 2 questions: Last reply: Marcio Alberto Casado Pereira, Aug 6, 2013, 10:18 am |
|
Exterior Lighting- Multiple BuildingsNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Aug 5, 2013, 9:08 am
Hi, How is possible to consider Exterior Lighting Energy Consumption on a Multiple Building Process where there is no specific boundary per each building? How can it be considered... Last reply: Marina Andrade, Aug 5, 2013, 10:54 am |
|
ComplianceHealthcare-v2009 IEQp1: Minimum indoor air quality performanceposted by Alicia Neubauer on Aug 6, 2013, 11:28 am
We have a project that just went through Preliminary Design Review. The calculations for the project are meeting LEED requirements, we have demonstrated that with an excel spreadsheet that we... Last reply: Alicia Neubauer, Oct 3, 2013, 2:53 pm |
|
ENERGY STAR equipment in medical clinic finish-outCI-2009 EAp2: Minimum Energy Performanceposted by Christine Robbins-Elrod on Aug 7, 2013, 8:18 pm
Our LEED-CI project is fitting within a... Last reply: Christine Robbins-Elrod, Nov 19, 2013, 3:14 pm |
|
Servers, routers, switchesCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Susan Walker-Meere on Aug 11, 2013, 10:59 am
Hi, Would you clarify if routers and switches should be included in the list? Last reply: Allen Cornett, Sep 18, 2019, 11:10 am |
|
Demolition implemented by separate contractorCS-2009 MRc2: Construction Waste Managementposted by Morteza Kasmaei on Aug 12, 2013, 2:02 pm
This CS project is a major renovation to an existing building and has separate contractors for demolition and major construction. The project is pursuing MRc2 - Construction Waste Management, is... Last reply: Morteza Kasmaei, Aug 13, 2013, 1:33 pm |
|
Emergency GeneratorNC-2009 PIf2: Project Summary Detailsposted by Nicole Kimoto on Aug 13, 2013, 1:55 pm
In our new facility we have an emergency generator that runs on diesel. If this is the case...on PIf2 should "fuel oil" be checked on the form under energy and water sources, even though its not... Last reply: Lise Dannesboe, Aug 23, 2018, 11:28 am |
|
InsulationCI-2009 EAc1.3: Optimize energy performance - HVACposted by Catalina Caballero on Aug 14, 2013, 2:38 pm
Our project consist in a conversion from a warehouse to a university. but only part of the univeristy is being certified. Obviously as a warehouse the building didnt have any type of insulation... Last reply: Marcus Sheffer, Aug 16, 2013, 8:51 am |