NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Kelly Bruvik on
Can direct reading instruments be used to measure VOCs and PM10? Another user asked specifically about the GrayWolf IAQ equipment and I was also wondering if it can be used for EQc3.2.
Validity of the agreement
Schools-2009 SSc10:Joint Use of Facilitiesposted by Maya Karkour on
Dear All, Our project has a signed agreement with a nearby university, valid until June 2013.
Simple LEED boundary question
NC-2009 PIf2:Project Summary Detailsposted by jack larson on
My LEED boundary consists of the following: a) A Commercial building b) Three small service buildings ( one which is a substation ) c) A swimming pool d) A tennis court My question is as follows
Saving percentage round up to the nearest integer?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
Will LEED round up the saving percentage to the nearest integer? e.g. 19.8% to 20%? Thanks in advance
Epoxy floor. Testing laboratories
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Irina Charkina on
Hello, We have a project in Russia under LEED for CS-2009 sertification. There are technical rooms with epoxy flooring. 1) Can anybody confirm if I am wrong or right?
Envelope Commissioning for a Major Renovation
NC-v4 EAc1:Enhanced commissioningposted by Eleni Tsivitzi on
Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.
LEED CI - deadline for submitting documentation
posted by Devanand Ragbir on
We registered the Project for LEED CI. A space of about 2000 sqft. As the space was small the client was able to outfit the space in 3 weeks time and occupied the space immediately after.
Final M&V Report
NC-2009 EAc5:Measurement and Verificationposted by Valerie Walsh on
We would like to know if the project can obtain its LEED certification prior to submitting the Final M&V Report, which is dependent upon 1 year of post-occupancy energy use data.
Tenant Lease or Sales Agreement
CS-2009 WEp1:Water Use Reductionposted by Curt Pascoe on
Is there any way to complete a legally binding document when there is no tenant identified? If I am constructing a building, but not installing fixtures, then an agreement is required.
Domestic Hot Water System
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Keerthi Ratnayake on
Is it a mandatory requirement to install a domestic hot water system in a LEED project?