direct reading instruments

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Kelly Bruvik  on 

Can direct reading instruments be used to measure VOCs and PM10? Another user asked specifically about the GrayWolf IAQ equipment and I was also wondering if it can be used for EQc3.2.

2
Fri Feb 27, 2015, 4:23 pm

Validity of the agreement

Schools-2009 SSc10:Joint Use of Facilities
posted by  Maya Karkour  on 

Dear All, Our project has a signed agreement with a nearby university, valid until June 2013.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 27, 2015, 3:36 pm

Simple LEED boundary question

NC-2009 PIf2:Project Summary Details
posted by  jack larson  on 

My LEED boundary consists of the following: a) A Commercial building b) Three small service buildings ( one which is a substation ) c) A swimming pool d) A tennis court My question is as follows

2
Fri Feb 27, 2015, 3:31 pm

Saving percentage round up to the nearest integer?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

Will LEED round up the saving percentage to the nearest integer? e.g. 19.8% to 20%? Thanks in advance

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 27, 2015, 2:34 pm

Epoxy floor. Testing laboratories

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Irina Charkina  on 

Hello, We have a project in Russia under LEED for CS-2009 sertification. There are technical rooms with epoxy flooring. 1) Can anybody confirm if I am wrong or right?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Feb 27, 2015, 9:11 am

Envelope Commissioning for a Major Renovation

NC-v4 EAc1:Enhanced commissioning
posted by  Eleni Tsivitzi  on 

Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 9:20 pm

LEED CI - deadline for submitting documentation

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Devanand Ragbir  on 

We registered the Project for LEED CI. A space of about 2000 sqft. As the space was small the client was able to outfit the space in 3 weeks time and occupied the space immediately after.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 8:48 pm

Final M&V Report

NC-2009 EAc5:Measurement and Verification
posted by  Valerie Walsh  on 

We would like to know if the project can obtain its LEED certification prior to submitting the Final M&V Report, which is dependent upon 1 year of post-occupancy energy use data.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 26, 2015, 8:11 pm

Tenant Lease or Sales Agreement

CS-2009 WEp1:Water Use Reduction
posted by  Curt Pascoe  on 

Is there any way to complete a legally binding document when there is no tenant identified? If I am constructing a building, but not installing fixtures, then an agreement is required.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 26, 2015, 6:02 pm

Domestic Hot Water System

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Keerthi Ratnayake  on 

Is it a mandatory requirement to install a domestic hot water system in a LEED project?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 5:11 pm