Log in
Forum
Topic

Signatories

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Michelle Rosenberger on Jul 8, 2013, 3:02 pm

Scott Bowman LEED Fellow Integrated Design + Energy Advisors, LLC LEEDuser Expert 520 thumbs up July 9, 2013- 6:03 pm I was hoping that some of the GBCI that haunt the forum would answer you. I have not used the v4 forms yet, so took a look at the sample. In my opinion, as a CxA, I am supposed to be seeking this document from the Owner and making sure that it represents their goals and criteria for the project, so I would be willing to initial that box in our process. I could also see the LEED Administrator or Prime initially that block, as they are typically heavily involved in the OPR development...

Last reply: Scott Bowman, Oct 23, 2013, 7:44 pm

Minimum/Mandatory Requirements for, VAV TU?

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge Torres-Coto on Jul 10, 2013, 6:37 pm

I have a Tenant Improvement that has...

Last reply: Jorge Torres-Coto, Jul 11, 2013, 3:58 pm

regularly occupied sf

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Jul 11, 2013, 8:54 am

1) Why is column regularly occupied sf in leedonline EAp2-1 table needed?
2) We have filled out EAp2-1 as per the spaces used in the energy model, not the project per say...i.e. thermal...

Last reply: Christopher Schaffner, Jul 15, 2013, 3:18 pm

Asphalt Milling- Will this qualify for MRc3 & MRc2?

NC-2009 MRc3: Materials Reuse
posted by Joel Simonyak on Jul 16, 2013, 5:24 pm

As part of our project the existing asphalt parking lot will be milled and the material will be reused in the new asphalt lot. The asphalt plant happens to be just across the...

Last reply: Heather DeGrella, Mar 12, 2014, 12:25 pm

RP for Credits with multiple thresholds

NC-2009 RPc1: Regional Priority
posted by Deborah Lucking on Jul 16, 2013, 6:05 pm

Can a project achieve the Regional Priority point without hitting the higher threshold of a credit? E.g., if the project's RP includes WEc1, will we achieve the RP point if we just reach 50%...

Last reply: Kathryn West, Mar 24, 2014, 1:35 pm

Calculating Total Irrigated Area with existing conditions

NC-2009 WEc1: Water Efficient Landscaping
posted by Joel Simonyak on Jul 17, 2013, 11:17 am

We have a large site in an industrial park. We plan to include a 24 Acre parcel in our project site boundary that is owned by our client and part of this area will contain the water detention...

Last reply: Lewis Hewton, Jul 17, 2013, 7:39 pm

Unavailable rainfall data

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Magda Aghababyan on Jul 19, 2013, 4:25 am

Hello, We have a project in Sri Lanka where we try to attempt this credit via percentile rainfall event option. However we find difficulty of getting continuous 30 year rainfall data. There are...

Last reply: Michael DeVuono, Jul 22, 2013, 8:35 am

date of occupancy on the LEED Online Template

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Benjie Herrera on Jul 24, 2013, 11:31 pm

Just want to inquire what is an OCCUPANCY DATE in the LEED on line
template? Is it the date the Owner received the Certificate of Occupancy
from governing authority to permit them...

Last reply: Benjie Herrera, Jul 25, 2013, 3:09 pm

Exhaust Requeriments with Natural Ventilation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Hector Miranda on Jul 26, 2013, 12:44 am

hi all, Can you meet the prerequisite using paragraph 5.1 (Natural ventilation) from Standard 62.1-2007 for areas that require exhaust system (i.e. toilets, kitchens, etc.)?

Thanks!

Last reply: Julia Weatherby, Jul 30, 2013, 11:00 am

Can someone help the new guy? Thanks?

NC-2009 IEQc7.1: Thermal comfort - design
posted by C M E on Aug 1, 2013, 1:45 pm

So I recently got hired, and the first thing they have me working on is getting familiar with LEED credits and completing the forms. This may sound like a dumb question, but how do I determine...

Last reply: Lindsay Austrom, Jun 1, 2015, 6:35 pm