Purchases for repairs

EBOM-2009 MRc3: Sustainable purchasing - facility alterations and additions
posted by Reynaldo Castro on Nov 15, 2011, 1:40 pm

We are a convention center and certified under pre-existing building requirements. We have a lot of shows and clients moving in and out. Sometimes major damage occurs and extensive repairs have...

Last reply: Alexa Stone, Nov 16, 2011, 3:05 pm

blower-door testing for hotel rooms with interior brick walls?

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Jutta Berns on Nov 10, 2011, 7:12 am

we have a hospitality project in south africa where a number of rooms will be (quietly) designated smoking rooms. each unit is well insulated and sealed off from each other through brick-and-...

Last reply: Jutta Berns, Nov 16, 2011, 10:02 am

Meter Capabilities?

Pilot-Credits PC25: Water Metering and Reporting
posted by Kimberly Frith on Sep 21, 2011, 3:55 pm

The credit submittals require "product data indicating meter has capabilities of meeting prerequisite requirements", but the credit language does not specify requirements for the meters...

Last reply: Lonny Blumenthal, Nov 16, 2011, 9:49 am

Upload Blower Door test results in design stage?

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Maria Porter on Sep 16, 2011, 2:49 am

IEQp2 is a design prerequisite. For residential units, (smoking allowed), we have to upload blower door test results. Since it is in design stage, there is yet nothing to perform testing on. Do I...

Last reply: Maria Porter, Nov 16, 2011, 9:06 am

Variable Speed Fan Coil Unit

NC-2009 EAc1: Optimize Energy Performance
posted by James Chueh on Nov 15, 2011, 2:22 am

There are more and more companies making fan coil units with...

Last reply: Marcus Sheffer, Nov 16, 2011, 8:59 am

Common dumpsters for overlapping CS and CI projects- same GC

CI-2009 MRc2: Construction Waste Management
posted by kathy zarsky on Apr 8, 2010, 2:05 pm

I have a situation not too unlike the first question raised above. I have a core and shell project and a CI project within same building whose schedules overlap. Valerie Walsh's response is...

Last reply: Maria Porter, Nov 16, 2011, 8:31 am

Epoxy floor coating

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Jana Schulz on Aug 23, 2010, 7:11 pm

Do you know what are the requirements to meet if I have an epoxy floor in my project? Thanks!

Last reply: Petra Hajná, Nov 16, 2011, 8:00 am

Cancellation due to inactivity

General forums
posted by Agustina Galli on Nov 9, 2011, 4:13 pm

Hello!
does anybody know where are the cancellation policies for projects? in the Certification Policy Manual says
"12.3 Cancellation Due To Inactivity: Subsequent to registering a...

Last reply: Emily Catacchio, Nov 15, 2011, 8:39 pm

IAQ managent- real live pictures

CI-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Susann Geithner on Nov 15, 2011, 5:48 pm

Here are some real live applications for...

UNUSUAL AND UNIQUE PROCESS LOAD

NC-2009 EAp2: Minimum Energy Performance
posted by Vindio Corro on Nov 15, 2011, 1:51 pm

We are working in a Project which is a unique green energy research facility (the second to be built in the World), and must receive the LEED Silver standard complying with the South Carolina...

Last reply: Marcus Sheffer, Nov 15, 2011, 2:25 pm