Naturally Ventilated CorridorsEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Matthew Macko on Nov 30, 2011, 3:53 pm
Do corridors need to have access to operable windows within 25 feet? Last reply: Dylan Connelly, Dec 2, 2011, 2:56 pm |
|
Exterior Lighting Trespass for Campus ProjectNC-2009 SSc8: Light Pollution Reductionposted by Omer Moltay on Dec 2, 2011, 2:09 pm
We are working on a mixed use development where we have to achieve this credit for two buildings (with facade lighting) on a master site, but the buildings are only 16 m. apart from each other.... |
|
ASHRAE 90.1- Mandatory Provision 10.4CI-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sobral on Dec 2, 2011, 8:21 am
If EPAct 1992 does not reference 50Hz electrical motors, these don't need to comply with 10.4 minimum efficiencies? Last reply: Marcus Sheffer, Dec 2, 2011, 11:09 am |
|
LEED plaques not included for v2 projectsGeneral forumsposted by Tristan Roberts on Nov 13, 2011, 9:36 pm
Brian, thanks for noting this. Here is the rest of the GBCI... Last reply: Angie Plantz, Dec 2, 2011, 10:58 am |
|
IEQp1 compliance for high-rise with 1 outdoor air intakeEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Dawn Brenner on Apr 27, 2011, 2:06 pm
The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007. The building has only one... Last reply: David Hubka, Dec 2, 2011, 10:08 am |
|
LEED NC 2.2 – Sunset DateLEED Rating System Selectionposted by Bryan Waters on Dec 1, 2011, 10:29 am
We have a project registered under LEED NC 2.2- After completion of Construction Documents of Phase 1; the project went on hold over a year ago. No submittals have been made to... Last reply: Susan Walter, Dec 2, 2011, 9:08 am |
|
SSc2 Option2CI-2009 SSc2: Development Density and Community Connectivityposted by Holly Himes on Sep 12, 2011, 6:34 pm
Does the entire residential area within the 1/2 mile radius need to be 10 units per acre or more or just a selection of higher... Last reply: Susan Walter, Dec 2, 2011, 8:59 am |
|
Documenting the credit...CI-2009 SSc2: Development Density and Community Connectivityposted by Jennifer Berthelot-Jelovic on Nov 28, 2011, 6:28 pm
I am currently submitting for a LEED CI v3.0 project and need to document the Development Density. I have no issues with Community Connectivity. That being said, how do I find the numbers that... Last reply: Susan Walter, Dec 2, 2011, 8:58 am |
|
Vacancy- EQp1 CalculationsEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Alice Cook on Jan 26, 2011, 5:50 pm
We have a floor that is vacant in our project building. In performing EQp1 calculations, I assume that # of occupants given for each zone should sum up to the total building occupants for other... Last reply: Dave Madsen, Dec 2, 2011, 8:23 am |
|
Measure AHUs or measure air flow in each room?EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Michelle Perez on Mar 1, 2011, 1:54 pm