Forum quick links
Option 3-Approach 2 Commuter Survey - representative selection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Christian Bösselmann on
In conducting the commuter survey according to Option 3 / Approach 2 I am would very much appreciate your feedback on the following topics. The multifunctional building is occupied by 1250 regular
Is softball infield at a school open space?
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Renee Shirey on
Since an infield would be dirt, and not actually "vegetated", should it be excluded from the open space - or am I overthinking it and deducting something that doesn't need to be deducted from the o
CI Lighting Compliance Exemption out of scope
CI-2009 EAp2:Minimum Energy Performanceposted by Alexis Voeltner on
Our CI project does not have lighting included in its scope (very cost prohibitive, for the way lighting is layed out in the space) and base building lighting is being planned to be used as is.
Parking Garage Demand Controlled Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Scott McMillan on
Hi there, When a proposed building model includes parking garage DCV based on CO - How should the control of the baseline model garage fan volume be controlled?.
Leed AP Exam
posted by brazer bozlak on
Does anybody have good suggestions and tips for studying for the LEED AP BD+C exam.
new floor in existing building envelope
NC-2009 PIf2:Project Summary Detailsposted by KIMBERLY KRAFT on
Hello LEEDUsers, We are submitting a project for LEED NC v.2009 - major renovation and new construction.
Unrenovated portion lighting power
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a building that consists of new, renovated and unrenovated area. We are using builidng area method for lighting power density.
Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b
Global Compliance Paths ASHRAE 62.1 & EN 15251 and EN 13779
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ian McCall on
Dear All, The Global compliance Path guide book gives the option between ASHRAE 62.1-2007 or European standards EN 15251: 2007 and EN 13779: 2007. Question : Can we use the ventilation rates desc
International Military Bases
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Peg Manuel on
Under the credit language for this credit, option 2 – there is NO MENTION of the words “public transportation.” It is clearly identified under options #1 & #3.