Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Expected Waste Volume

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Saud Abdul Rasheed  on 

Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.

4
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Thu Dec 31, 2015, 3:45 am

Invoice Requirements

CS-2009 MRc6:Certified Wood
posted by  Charles Nepps  on 

Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al

3
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Wed Dec 30, 2015, 9:37 pm

Where is the line again?

NC-2009 MRc7:Certified Wood
posted by  Daniel Hartsig  on 

There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo

2
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Wed Dec 30, 2015, 9:34 pm

Exam room compliance

Healthcare-v2009 IEQc6.1:Controllability of systems - lighting
posted by  Todd Bundren  on 

what are the requirements for IEQc6.1 as it relates to exam rooms in an outpatient cancer center?

2
Wed Dec 30, 2015, 9:15 pm

PERCENTAGE OF MALE USING URINAL

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  JAMES MARK CHAN  on 

is there any guidance about percentage of male expected to use urinal.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Wed Dec 30, 2015, 5:48 pm

Pre-Rinse Spray Valve Before 11/1/2011 addenda

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Crina Bosch   on 

Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Dec 30, 2015, 4:48 pm

Default Fixture use for a School Project (shower)

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Markus Henning  on 

I am working on a school project and actualy calculating WEp1. I am wondering that the default fixture use for a school indicate no daly uses for a shower for students.

2
Wed Dec 30, 2015, 3:55 pm

Below Grade levels - excluded?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Maya Karkour  on 

Hello, I have a question regarding below grade levels which have regularly occupied spaces If we refer to the excel sheet "HC Supplemental Daylight and Views Calculation Spreadsheet", it is specifi

3
Wed Dec 30, 2015, 9:34 am

Single Building Certification_LEED New Construction 2009

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Aswin M  on 

We have a Garment factory project that has three blocks with connectivity bridge.  The three blocks are namely Cutting block, Sewing block, and Fabric store block.

7
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Wed Dec 30, 2015, 5:06 am

Thinset Epoxy Terrazzo poured floor.

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Nelina Loiselle  on 

We have project using an epoxy terrazzo poured floor where the VOC's for both components are 0 g/L. I understand that these would be listed in IEQc4.2 under floor coatings.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Dec 24, 2015, 11:41 pm