Forum quick links
Expected Waste Volume
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Saud Abdul Rasheed on
Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.
Invoice Requirements
CS-2009 MRc6:Certified Woodposted by Charles Nepps on
Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al
Where is the line again?
NC-2009 MRc7:Certified Woodposted by Daniel Hartsig on
There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo
Exam room compliance
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by Todd Bundren on
what are the requirements for IEQc6.1 as it relates to exam rooms in an outpatient cancer center?
PERCENTAGE OF MALE USING URINAL
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by JAMES MARK CHAN on
is there any guidance about percentage of male expected to use urinal.
Pre-Rinse Spray Valve Before 11/1/2011 addenda
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Crina Bosch on
Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.
Default Fixture use for a School Project (shower)
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Markus Henning on
I am working on a school project and actualy calculating WEp1. I am wondering that the default fixture use for a school indicate no daly uses for a shower for students.
Below Grade levels - excluded?
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Maya Karkour on
Hello, I have a question regarding below grade levels which have regularly occupied spaces If we refer to the excel sheet "HC Supplemental Daylight and Views Calculation Spreadsheet", it is specifi
Single Building Certification_LEED New Construction 2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Aswin M on
We have a Garment factory project that has three blocks with connectivity bridge. The three blocks are namely Cutting block, Sewing block, and Fabric store block.
Thinset Epoxy Terrazzo poured floor.
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Nelina Loiselle on
We have project using an epoxy terrazzo poured floor where the VOC's for both components are 0 g/L. I understand that these would be listed in IEQc4.2 under floor coatings.