Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Shuttle bus

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Karim Farah  on 

“ The project (a private factory) is seeking to fulfill the credit requirement of the credit SS Credit 4.1 – Alternative Transportation – Public Transportation access) .

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 5, 2016, 5:13 am

Option on Survey of Fuel-efficient Carpool /Vanpool?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Michelle Bracewell-Musson  on 

Hello, I have used a survey that was accepted by GBCI based on the Leeduser Template, however, I feel like it would streamline the process if I gave two additional options in the How You Travelled

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Jan 4, 2016, 9:56 pm

CrowdComfort - Credit IEQc7.2

CI-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Scott Balboni  on 

Hi All, I work for a tech start-up called CrowdComfort and we're looking to potentially partner with the Massachusetts USGBC.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 4, 2016, 7:07 pm

EUROPE: Pre-rinse spray valve 1.6gpm or lower

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Charline SEYTIER  on 

Our project is an office bldg with a Kitchen Restaurant in Europe. We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in France/Switzerland/Germany...

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 4, 2016, 4:19 pm

CSR- GRI Report

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  LEED Pro Consultant  on 

I have a question regarding option 1. The GRI report for a product does not address the raw material supplier extraction location.

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Mon Jan 4, 2016, 3:05 pm

Water Consumption Outside LEED Boundary

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Aswin M  on 

We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).

8
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Mon Jan 4, 2016, 4:52 am

Eyeball Audits as Backup for Commingled Diversion

Homes-v2008 MRc3:Waste management
posted by  Michelle Rosenberger  on 

Hi Ann, This is a repost from NC, MRc2. I am hoping that you can shed some light on this. Our Seattle region has a very developed state regulated construction waste diversion infrastructure.

2
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Thu Dec 31, 2015, 11:04 pm

VOC limits?

Retail-CI-v2009 IEQc4.6:Low-emitting materials - ceiling and wall systems
posted by  Erica Downs  on 

I am new to IDC Retail... hopefully others have some experiece? i have the IDC Retail Supplement, and it really does not say anything at all other than the language provided above.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 31, 2015, 5:54 pm

Expected Waste Volume

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Saud Abdul Rasheed  on 

Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.

4
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Thu Dec 31, 2015, 3:45 am

Invoice Requirements

CS-2009 MRc6:Certified Wood
posted by  Charles Nepps  on 

Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al

3
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Wed Dec 30, 2015, 9:37 pm