Forum quick links
Walk off mat length within vestibule
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maria Papiez on
Have there been any exceptions to the walk-off mat length requirement when vestibules are located at an exterior entry?
natural land cover conditions in a portion of project site
NC-v4 SSc4:Rainwater managementposted by Noriko Nagazumi on
Hi, Our project site contains a portion of natural land cover conditions site and previously developed site.Shall we use option 1, or shall we use combined option 1 and 2, such as using option 1
Credit MR 7 Certified Wood Question
Schools-2009 MRc7:Certified Woodposted by Sara Axon on
We are working on a project that has this requirement in the contract: "Credit MR 7: Provide a minimum of 50 percent (by cost) of wood-based materials that are produced from wood obtained from for
EA Pr 2 - Water Heating Equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
I have a 12kW electric water cylinder and a 12kW direct gas fired water heater.
EAc5.1 vs EAc5
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Mohammad Haj-Ali on
As I understand having read user comments, although the reference guide emphasizes that electricity is to be measured, other energy sources should also be measured just like M&V for new constru
ASHRAE 90.1 2007 Appendix G System Type 6
NC-2009 EAp2:Minimum Energy Performanceposted by deborah davidson on
We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.
IEQp1 VRP Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Vassil Vassilev on
Greetings, Regarding IEQp1 and VRP Compliance Calculator there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
2 office floors on a 20 stories building
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Michael E. Edmonds-Bauer on
Hello, We have a cliente that is interested in pursuing LEED for his brand new offices.
SSc2 Activity log 20% of the time
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Mary Rose Anlacan on
Hi everyone, I need help in documenting SSc2 and SSc3 from the preliminary review comment i received for EB O&M project.I'm not clear what i need to write in a narrative from the below comment
Shuttle bus
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Karim Farah on
“ The project (a private factory) is seeking to fulfill the credit requirement of the credit SS Credit 4.1 – Alternative Transportation – Public Transportation access) .