Hi everyone, I need help in documenting SSc2 and SSc3 from the preliminary review comment i received for EB O&M project.I'm not clear what i need to write in a narrative from the below comments: 1. For SSc2 - Please provide an activity log summarizing the maintenance equipment, cleaning practices, and paints and sealants utilized during the performance period and provide evidence that, during the performance period, environmentally preferred practices for these elements were used at least 20% of the time. This documentation must be a narrative, at minimum. --- Is there any sample activity log you can share with me to document this credit? 2. SSc3 - Please provide documentation demonstrating that environmentally preferred practices were utilized at least 20% of the time during the performance period for the chemical fertilizer and landscape waste diversion components of the plan. This documentation must be a narrative, at minimum. This is my first EBOM project.

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 12/11/2014 - 16:46

Hi Mary, For SSc2, you’ll need to provide documentation (i.e. a spreadsheet/table/narrative) demonstrating what what happened for each of the components listed in the comment (maintenance equipment, cleaning products, etc) during the performance period. The plan you developed should lay out the performance metric for each component (i.e. what you should be tracking over the performance period). For cleaning products for example, your log would show the quantity of each product used (by cost or whatever your plan metric is), and it would show which products were sustainable. You’d then be able to show that (for example) 53% of cleaning products used on the exterior/hardscape were sustainable. Or if you didn’t use any cleaning products, you can state that in a narrative. For SSc3, it’s the same as what I described above, but for landscape waste diversion and fertilizer use. Hope this helps!

Wed, 12/17/2014 - 07:00

Hi, Thanks Trista. I do appreciate your response .:-).. I got this credit and achieved the LEED certification last 14 August 2014..

Tue, 01/05/2016 - 07:01

Can anyone help in preparing the Activity log. For a LEED EB project review, we are to prepare an Activity log for SS c2 & SS c 3. Is there any sample activity log you can share with me to document this credit?

Tue, 01/05/2016 - 15:26

Aswin, yes—LEEDuser offers templates for our members under the Documentation Toolkit tab above.