Strategy changes after construction reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Michael Smithing on Feb 9, 2012, 8:27 am
1. On a CI project we made a mistake on our water efficiency calculations that means we will not be able to achieve the exemplary performance for either our space or the entire building (SSc1,... Last reply: Susann Geithner, Feb 13, 2012, 1:43 pm |
|
LPD for space with higher headroomNC-2009 EAc1: Optimize Energy Performanceposted by William Wong on Feb 12, 2012, 8:55 pm
Does anyone know what headroom height are based on when ASHRAE design the... Last reply: Marcus Sheffer, Feb 13, 2012, 9:41 am |
|
external lighting LPD contribution to percentage energy savingsCS-2009 EAc1: Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on Feb 11, 2012, 11:54 am
Hello there What does this mean : Ensure that no credit is taken in the proposed case for lighting reduction on tradable surfaces" Does this mean if the... Last reply: Marcus Sheffer, Feb 13, 2012, 9:35 am |
|
Team Members Blocked from accessing the ProjectGeneral forumsposted by Mairead Morrissey on Feb 10, 2012, 6:28 am
Hi, I'm not sure if this is the place for this post but I can't find a more relevant one. Two team members who had registered with LEED online, found they were blocked when trying to access the... Last reply: Mairead Morrissey, Feb 13, 2012, 3:13 am |
|
fan power calculationCS-2009 EAp2: Minimum Energy Performanceposted by Johannes Gellrich on Oct 12, 2011, 5:21 am
Hi everyone, Last reply: Marcus Sheffer, Feb 12, 2012, 3:06 pm |
|
EAc6 in Abu DhabiNC-2009 EAc6: Green Powerposted by Scott Bixby on Feb 8, 2012, 5:22 pm
I am trying to calculate the... Last reply: Marcus Sheffer, Feb 12, 2012, 2:21 pm |
|
Utility Company ProjectNC-2009 EAc6: Green Powerposted by Ashonta Langdon on Feb 7, 2012, 10:12 am
The project I am working on is for a utility company. Can we pursue this credit if purchasing the... Last reply: Marcus Sheffer, Feb 12, 2012, 2:03 pm |
|
Occupancy Sensor definitionCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by CRB Sustainability on Jan 18, 2012, 1:58 pm
I am not seeing a definition for an occupancy sensor in the 2009 CI reference guide. Would lights that are placed on a timer that automatically shuts off after a period of time (15 min, 1hr etc... Last reply: Dan LeBlanc, Feb 11, 2012, 1:26 pm |
|
Connected lighting load include exterior lighting?CI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by CRB Sustainability on Jan 18, 2012, 1:55 pm
I would assume that the connected lighting load calculation for Option 2 or 3 would not include the exterior lighting since the exterior areas would not (normally) be on an occupancy sensor (... Last reply: Dan LeBlanc, Feb 11, 2012, 1:06 pm |
|
Daylight Controls for 50% of Lighting Load?CI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Simon Ng on Jan 17, 2012, 7:44 pm
Dear all, I am working on a CI Library renovation and we have an existing cellar where the majority of the services exist (IE. Boilers, IT Servers). The cellar, which counts for 1/3 of our LEED... Last reply: Dan LeBlanc, Feb 11, 2012, 1:05 pm |