I would assume that the connected lighting load calculation for Option 2 or 3 would not include the exterior lighting since the exterior areas would not (normally) be on an occupancy sensor (photovoltaic sensor or timed instead). Can anyone confirm?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.