Forum quick links
European standards for bio-based materials
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Ana Villarroya on
I'm working on a building's purchasing and waste policy and I'm using LEED's template.
Carsharing in open areas
ND-Plan-v4 NPDc8:Transportation demand managementposted by William Gagnon on
Hello, Any precedents on how to integrate carsharing services such as Car2Go, Communauto or Zipcars that do not have specific restrictions on drop-off points?
NPDc4 Option 2 : how to determine price of for-sale units
ND-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hey-ya, We are having a hard time finding out how to calculate Option 2 : Affordable Housing, for-sale units. We read from the LEED ND v4 reference guide : ''Determine the maximum amount of incom
smoke leakage test for duct
NC-2009 EAc3:Enhanced Commissioningposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test? prior to air leakage test since the project specs is giving a small allowable 1% from basis of design?
District Energy Cx Guidance
NC-v4 EAp1:Fundamental commissioning and verificationposted by Candice Rogers on
Hello, We have a project that meets the requirements of District Energy Systems. There is one new piece of equipment and multiple existing that will serve the facility.
LEED Clarification for Filtration Credit Requirements
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mary Kay on
We've heard that per a recent LEED clarification for filtration credit requirements, MERV 13 filtration is required on ALL outdoor air handling units, not just those serving regularly occupied spac
MR 2.2 Form Change
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Fred Smith on
I am confused as the the new form on LEED On Line vs what you are showing on LEED User. I am not sure what is needed to upload in regards to our purchasing and criteria for sustainability.
Documented floor plans with occupancy scale
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
Before I began uploading the floor plans showing the controls and lighting equipment on the LEED online template for EAc1.2, I noticed that the templates requests floor plans indicated which zones
owner/tenant contract
CS-2009 EAc6:Green Powerposted by FABIO VIERO on
Hi all, we are working on a shell&core project that, once completed, will be a single tenant occupied buiding.
Rooms designed with no windows, but still part of ROA
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Anna Korinkova on
Are there any areas that can be exempt from dayligting calculations, while still being part of ROA?