Finished surface of structural wall?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Erin Holdenried  on 

Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks!

3
Wed Mar 22, 2017, 3:46 pm

review comments not matching

Navigating LEED Online
posted by  emily reese moody  on 
Ok, I've discovered a new problem... I've had several projects go through GBCI reviews and receive comments back since this form update happened.
8
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Tue Mar 21, 2017, 4:49 pm

Can roofed areas be considered open space?

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Alejandro Rivera  on 

Our project is a mixed-used building in an urban area that will most probably earn SSc2.

3
Chief Consulting Officer
NÁRUM Consult
LEEDuser Basic Member
0 thumbs up
Mon Mar 20, 2017, 4:58 pm

Weld-Thru Primer

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Celimar Fournier  on 

Our structural steel subcontractor is currently using a Sherwin Williams Weld-Thru Primer at the shop location. This is for anti-corrosive/rust purposes.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 20, 2017, 1:58 am

ATES in combination with HP

NC-v4 EAc5:Renewable energy production
posted by  Ydo Schuuring  on 

We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 17, 2017, 10:18 pm

Credits in addition to Optimize Energy Performance?

NC-v4 EAc5:Renewable energy production
posted by  Dianne Herrin  on 

Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 17, 2017, 9:55 pm

porcelain tiles

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Neetika Parmar  on 

Hi, our project is installing porcelain tiles which are certified by eco label, green building council italia and singaporian green building.

3
Fri Mar 17, 2017, 8:42 pm

Tyroc subflooring?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Courtney Royal  on 

I have a project which wants to use Tyroc subflooring, has anyone heard or used this product? This product is not a finished flooring product or FloorScore or Greenguard certified.

6
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Mar 17, 2017, 8:34 pm

Extraction Monoxide in Basement During Construction

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Alan Viale  on 

we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Fri Mar 17, 2017, 7:09 pm

MPR Supplemental Guidance Clarification

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Brian Bartholomew  on 

Regarding MPR2, the "Supplemental Guidance to the Minimum Program Requirements (Revision 2)", on page17 Article III.1) is titled "VERTICALLY ATTACHED, LEED-EB: O&M, AND MAJOR RENOVATION PROJECT

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Mar 17, 2017, 5:04 pm