Forum quick links
Finished surface of structural wall?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks!
review comments not matching
posted by emily reese moody on
Can roofed areas be considered open space?
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Alejandro Rivera on
Our project is a mixed-used building in an urban area that will most probably earn SSc2.
Weld-Thru Primer
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Celimar Fournier on
Our structural steel subcontractor is currently using a Sherwin Williams Weld-Thru Primer at the shop location. This is for anti-corrosive/rust purposes.
ATES in combination with HP
NC-v4 EAc5:Renewable energy productionposted by Ydo Schuuring on
We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.
Credits in addition to Optimize Energy Performance?
NC-v4 EAc5:Renewable energy productionposted by Dianne Herrin on
Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.
porcelain tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Neetika Parmar on
Hi, our project is installing porcelain tiles which are certified by eco label, green building council italia and singaporian green building.
Tyroc subflooring?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Courtney Royal on
I have a project which wants to use Tyroc subflooring, has anyone heard or used this product? This product is not a finished flooring product or FloorScore or Greenguard certified.
Extraction Monoxide in Basement During Construction
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Alan Viale on
we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h
MPR Supplemental Guidance Clarification
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brian Bartholomew on
Regarding MPR2, the "Supplemental Guidance to the Minimum Program Requirements (Revision 2)", on page17 Article III.1) is titled "VERTICALLY ATTACHED, LEED-EB: O&M, AND MAJOR RENOVATION PROJECT