Forum quick links
Section 3.10 compliance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Edgar Arevalo on
I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.
Interior paint's VOC
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Magda Aghababyan on
According to Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993 the VOC limit for interior flat paint is 50 grams/liter of product minus water.
Air testing related to partial renovation per floor
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Julie Barth on
I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.
Help with LEED ND
ND-Plan-v4 MPR1:Must be in a permanent location on existing landposted by T J on
I'm a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including chec
Laboratory
NC-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?
FTE is linked to IEQc6.1 and IEQc6.2 - Healthcare buildings
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by VICTOR MORENO on
In our Healthcare project, there are different workers during the morning, afternoon and evening, with a time of 8 hours each. If I count the FTE, I get a total of workers greater to the number of
Entry way systems
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Kerry Honsinger on
I read recently in a thread that someone was claiming Entry Vestibules are required. Nowhere in the reference guide am I reading this.
2010 AGMBC v2
posted by Francis Hernández on
We are a GC with primarily Federal Government construction contracts. We have a project that references the 2010 LEED AGMBC v2 and I cannot find it anywhere.
Exhaust rate in retail units.
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by VEL MUTHU on
I am currently working on a project which has 6 retail outlets in a very big building for the users in that building.
LEED Committment
posted by Kerry Honsinger on
Hypothetically speaking, once building certification is approved upon final construction submittal/approval, what happens if the owner wants to change something?