Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Section 3.10 compliance

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Edgar Arevalo  on 

I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 13, 2017, 1:30 pm

Interior paint's VOC

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Magda Aghababyan  on 

According to Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993 the VOC limit for interior flat paint is 50 grams/liter of product minus water.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 13, 2017, 5:04 am

Air testing related to partial renovation per floor

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Julie Barth  on 

I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.

4
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Sat Mar 11, 2017, 12:44 am

Help with LEED ND

ND-Plan-v4 MPR1:Must be in a permanent location on existing land
posted by  T J  on 

I'm a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including chec

7
Default Avatar
LEEDuser Basic Member
0 thumbs up
Thu Mar 9, 2017, 7:11 pm

Laboratory

NC-v4 WEp2:Indoor water use reduction
posted by  Vanessa Montezuma Ramos  on 

My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Mar 9, 2017, 3:13 pm

FTE is linked to IEQc6.1 and IEQc6.2 - Healthcare buildings

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  VICTOR MORENO  on 

In our Healthcare project, there are different workers during the morning, afternoon and evening, with a time of 8 hours each. If I count the FTE, I get a total of workers greater to the number of

4
Green Building Energy Consultant
Green Living Projects
LEEDuser Basic Member
2 thumbs up
Thu Mar 9, 2017, 12:10 am

Entry way systems

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Kerry Honsinger  on 

I read recently in a thread that someone was claiming Entry Vestibules are required. Nowhere in the reference guide am I reading this.

3
Default Avatar
Reynolds Ash and Associates
LEEDuser Basic Member
5 thumbs up
Mon Mar 6, 2017, 9:29 pm

2010 AGMBC v2

LEED Guidance for Campuses and Multiple Buildings
posted by  Francis Hernández  on 

We are a GC with primarily Federal Government construction contracts. We have a project that references the 2010 LEED AGMBC v2 and I cannot find it anywhere.

3
Design Manager
Caddell Construction Co. (DE), LLC
LEEDuser Basic Member
2 thumbs up
Mon Mar 6, 2017, 7:59 pm

Exhaust rate in retail units.

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  VEL MUTHU  on 

I am currently working on a project which has 6 retail outlets in a very big building for the users in that building.

4
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Mar 6, 2017, 12:08 pm

LEED Committment

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Kerry Honsinger  on 

Hypothetically speaking, once building certification is approved upon final construction submittal/approval, what happens if the owner wants to change something?

8
Default Avatar
LEEDuser Expert
472 thumbs up
Sat Mar 4, 2017, 9:01 pm