Forum quick links
Applicablility of Options for BD+C Rating System
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Mercedes Ferreira on
I noticed that three options are available for the energy performance credit: 1) whole-building energy simulation, 2) Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide, and 3) Presc
NAUF insulation
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Debra a. Lombard on
Were'a a GC. Does insulation (board and/or batt) need to also be NAUF either under this credit or elsewhere?
Declare Label
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Does any product with the Declare label contribute to this credit?
Additions to existing buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Would an addition of floor area inside an existing building shell be considered an addition to an existing building therefore requiring compliance with the "new building" threshold for reduction in
Bike Racks
NC-2009 MRc4:Recycled Contentposted by Michael Sugar III on
Currently FF&E (~Division 12) falls under the all or nothing when it comes to use for Recycled Content and/or Regional Materials.
Factory with a high unregulated energy loads- LEED EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Hello, I am a beginner in LEED. I have a question regarding to EAp2. I am recently preparing LEED certificate report for a factory.
Invoice vs Bill of Lading
NC-2009 MRc7:Certified Woodposted by Michael Sugar III on
Door supplier is hesitant to provide copy of Invoice from Manufacturer. He has provided a copy of the Bill of Lading indicating FSC %, and COC #.
Reflectance
NC-v4 EQc7:Daylightposted by Inês Marques on
Hi everyone, I'm having trouble finding datasheets with the reflectance values for the project I'm working on.
Aerators use in water flow fittings
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Magda Aghababyan on
Hi, Currently we are working in a office project. For the aesthetic purposes the project owners has selected flow fittings which does not meet the LEED requirement.
Water use in a campus project
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Magda Aghababyan on
We are working on a LEED campus project which is going to be certified with one new construction building (will be certified LEED NC 2009) and some other buildings which are not going to be certifi