Forum quick links
Increased ventilation instead of alarms?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Maria Porter on
I understand that for densely occupied spaces an alarm (visible or audible) is required.
ANSI/ASTM-E779 version
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by MARCIO OROFINO on
We have a project in Rio de Janeiro registered under CS and to which the fan door test shall be conducted since it is composed of three residential buildings.
Question about ASE study area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions about this credit? A) Assuming a project go for option 1.
v2009 CORE AND SHELL FOR RETAIL
posted by Joel Bennett on
Just a quick question; is it possible to certify a retail building under C&S rating system rather than Retail NC? Thank you all in advance!
The Eco Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Alternative approach to SS credits than the campus approach
NC-2009 SSc2:Development Density and Community Connectivityposted by JASON BONE on
Our new construction project is a new fitness center on the periphery of a community college campus, which is adjacent to a landscape valley (with no density).
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.
Lease requirements for this credit
CS-2009 IEQc2:Increased Ventilationposted by Troy Glasner on
Hi, I am just wondering what specific lease requirement language would be needed for this credit.
LEED lease agreement for CS
CS-2009 IEQc2:Increased Ventilationposted by Alfonzo Collins on
I am working on a core & shell building. The owner will only be installing AHUs for a few core & shell spaces.