Elevator lobbies -with airlocks?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.

0

Fire Suppression water count as a candidate for Submetering?

CS-v4 WEc4:Water metering
posted by  Jennifer Turchin  on 

Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?

1
Fri Sep 1, 2017, 7:11 pm

Option 3 Strategy '4'

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Gail Napell  on 

For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?

1
Sat Aug 26, 2017, 7:39 pm

Private shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Hanh Truong  on 

Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b

1
Thu Aug 10, 2017, 12:08 pm

CI clarification

CI-2009 MPR1:Must comply with environmental laws
posted by  Hariraman R  on 

If i want to Certify a portion of a building ?? shall i go for LEED CI ??

0

air-side economizer, how to input in calculator

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Courtney Royal  on 

Our project is a one floor (on the 30th) LEED-CI project gut renovation project.

1
Thu Aug 10, 2017, 10:42 am

List of meters

NC-v4 EAc3:Advanced energy metering
posted by  Vasileios Kalfountzos  on 

Hello all, our project is a Data Center that every single part of it will be metered. Each rack will have two meters while also every electrical panel will have each own meter.

1
Thu Aug 10, 2017, 4:04 pm

Double- Counting of Renewable Energy

CI-v4 EAc4:Renewable energy production
posted by  Bharath Ravuru  on 

Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?

1
Mon Aug 28, 2017, 2:09 pm

Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm

Final Cleaning

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Benjamin McGrath  on 

For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.

1
Sat Aug 26, 2017, 8:50 pm