Forum quick links
n/a
NC-2009 EAp2:Minimum Energy Performanceposted by Sivarajah Ragulakeethan on
Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.
Proposed design modelling
CS-2009 EAp2:Minimum Energy Performanceposted by Sivarajah Ragulakeethan on
Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.
Core and shell within an NC
NC-v4 EQc8:Quality viewsposted by Susan Di Giulio on
We are workingon a 3 story makers lab and classroom building at a university. The third floor is being built as core and shell for a future decision on use.
Outdoor airflow measurement device?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Aru Sau on
Besides CO2 sensors, what kind of outdoor airflow measurement device we need to provide in the design? Are there any particular rules to quantify how many devices and where to put them?
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.
Farmland of Statewide Importance
NC-2009 SSc1:Site Selectionposted by Norma Lehman on
Our project is LEED NCv2009 and the site is designated as "Farmland of Statewide Importance", but not Prime Farmland. We are trying to clarify Prime Farmland v. Farmland of Statewide Importance.
Zero Waste Certification
NC-2009 IDc1:Innovation in Designposted by Norma Lehman on
LI#10442 allows a building that's earned U.S.
Automatic Receptacle Control for Renovation projects
CI-v4 EAp2:Minimum energy performanceposted by Jeni Panars on
ASHRAE requires at least half of all private offices, open offices, and computer classrooms to be controlled by an automatic control device.
Preferred Parking both inside and outside LEED boundary
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by sompoche sirichote on
Our project is factory expansion and our client purchase a new land nearby for parking facilities. The local zoning require 110 parking lot so we provide 104 parking lots on a new land outside LEED
CO2 sensors - "thermal zone"
CS-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
For naturally ventilated spaces in one of my projects it seems that CO2 monitors are the only option applicable. I've got some questions regarding this: 1.