Project size extended in the middle of construction
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
Demolished and rebuilt envelope
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?
Baseline System 2
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
Calibration
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
Hallo, According to the BMS and HVAC subcontractor, the sensors do not need to be calibrated, particularly CO sensors and chilled water temperature sensors.
Resources Links not working
NC-2009 SSp1:Construction Activity Pollution Preventionposted by RYAN BEN SABILALA on
I noticed some of the links for the Resources Page are not working anymore. Can anyone do an update? Thank you.
Dynamic Glazing for IDC ?
NC-v4 INc1:Innovationposted by Sriranjani Ramachandran on
Can anyone claim points under the Innovation in Design Credit-Path 1 for using dynamic Glazing in the project?
Herbicides and Pesticides used during performance period
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Joseph Snider on
I am a bit confused about the use of herbicides and fertilizers for landscaped areas within the LEED boundary.
belated project registration / certification process feedback
CS-v4 SSp1:Construction activity pollution preventionposted by Daniela Mendez on
Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.
Pressurization requirements in LEED v4
NC-v4 EQp2:Environmental tobacco smoke controlposted by Judhajit Chakraborty on
We have a project where the hallways are pressurized to provide ventilation air thru door undercuts.
Vertically Attached Project
CS-v4 EAc2:Optimize energy performanceposted by LEED Pro Consultant on
Our team is working on a project which follows a vertically attached approach.