posted by Katie Mesia on Oct 5, 2012, 9:35 am

We are in schematic design on a CS project. The project will have underground parking and will use piles as a foundation. Because they are digging so deep we looked in to using geothermal piles...

Last reply: Marcus Sheffer, Oct 10, 2012, 10:05 am

Efficiencies for System 4 – PSZ-HP (packed roof top heat pump)

NC-2009 EAc1: Optimize Energy Performance
posted by Francesco Passerini on Sep 27, 2012, 10:21 am

According to Table G3.1.1A for the baseline model I have to model System 4 – PSZ-HP (packed roof top heat pump).
I’m wondering what efficiencies I have to consider.
Shall the electric...

Last reply: Francesco Passerini, Oct 10, 2012, 6:28 am

Porte Cochere- parking and hardscape

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Lawrence Lile on Oct 9, 2012, 6:29 pm

The Porte Coachere (the dropoff entry) of a hotel is usually covered. I am struggling with two questions on a hotel project:

1. Is the Porte Cochere a parking space? Cars do stop there...

Thermal comfort for fitness center

NC-2009 IEQc7.1: Thermal comfort - design
posted by HOUCINE TLEMSANI on Aug 23, 2012, 4:27 pm

I am working on a fitness center where the temperature is maintained low and the air velocities adequate thru the use of fans.
The ASHRAE tool show that the people that are working out and...

Last reply: Kimberly Frith, Oct 9, 2012, 5:48 pm

Automatic vs Manual shades

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mike Decoster on Jul 2, 2012, 11:41 am

We are working on a LEED 2009 NC project and looking at the daylighting. If the daylighting by the perscriptive method exceeds the VLT x...

Last reply: TODD REED, Oct 9, 2012, 1:52 pm

FTE Calculation for Theater

Calculating FTEs
posted by Cristian Wolleter on Oct 9, 2012, 12:31 pm

We are calculating...

Last reply: Tristan Roberts, Oct 9, 2012, 1:15 pm

EQ 8.2 Calculator

Schools-2009 IEQc8.2: Daylight and views - views
posted by M Carolina Weitzman on Oct 9, 2012, 12:39 pm

The calculator table comes with only one page of classroom spaces to list however I have more than one page. How can I add more classroom pages so it all calculates properly?

Last reply: TODD REED, Oct 9, 2012, 12:59 pm

Calculating FTE

Calculating FTEs
posted by Adriana Salles on Oct 8, 2012, 10:17 am

Hello!
We are pursuing LEED NC 2009. Our project is a Data center office building which will be operated 24 hours, 365 days per year, with No transients, visitors or residents in the...

Last reply: Adriana Salles, Oct 9, 2012, 12:33 pm

ashrae 90.1 2007- space type

CI-2009 EAp2: Minimum Energy Performance
posted by gustavo goldman on Oct 6, 2012, 2:32 pm

The selling area of a retail commercial interior project will be a conditioned space located over a parking area whose height is half under sidewalk level and half above it. This happens on 2 of...

Last reply: Marcus Sheffer, Oct 9, 2012, 12:04 pm

Option 3- Measurement. Height?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Candice Rogers on Oct 8, 2012, 4:54 pm

Hello -

Could you please confirm the measurement height for the daylight readings? Is this the workplane, floor, or other height?

Thank you very much -
Candice

Last reply: TODD REED, Oct 9, 2012, 8:44 am