Log in
Forum » Europe – Eastern
Topic

Partial use of Plant equipment for LEED certification

NC-v4 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Nov 3, 2022, 10:08 am

Greetings,

The project we are modeling consists of two building attached tightly one to the other (wall to wall). The HVAC project has been developing  these two building by applying one...

Last reply: Tyler Thumma, Dec 16, 2022, 7:50 am

Green Power contract engagement question

NC-v4 EAc7: Green power and carbon offsets
posted by Norbert Harmathy on Nov 22, 2022, 9:10 am

Hello,

We want to apply for the Green Power and Carbon Offset credits under LEED v4 BD+C New Construction & Major renovation project.

The credit description states that the...

Last reply: Marcus Sheffer, Dec 1, 2022, 10:53 am

Should archaeological works, taking place before construction start, be included in ESC Plan?

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Agata Mozer on Nov 30, 2022, 5:29 am

Dear All,

We have a project which is located in a...

Last reply: Emily Purcell, Nov 30, 2022, 9:45 am

Calculation Rainwater Amount V4 vs V2009

NC-v4 SSc4: Rainwater management
posted by Anna Korinkova on Oct 10, 2022, 2:26 am

Hello everyone,

I have managed to read trough the comments in the forum and from what i have read i understood that the calculation that indicates the amount of water to be managed on site...

Last reply: Anna Korinkova, Oct 18, 2022, 1:18 pm

Stairwell Lighting zone

NC-v4 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on Jan 28, 2020, 8:21 am

According to ASHRAE 90.1, section 9.4.1.6 „g. Stairwell Lighting – Lighting in stairwells shall have one or more control devices to automaticcly reduce lighting power in any one controlled zone...

Last reply: Marcus Sheffer, Oct 12, 2022, 11:15 am

Certification system for the Baseline project

CS-v4 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Sep 20, 2022, 4:58 am

Greetings,

The energy source of the project we are modeling is electricity only.

The project’s AHUs equipment is assigned to VRF HR intis, which is covering respectively its heating...

Last reply: Marcus Sheffer, Sep 20, 2022, 10:18 am

Letter

CI-v4.1 IPc1: Integrative process
posted by Aleksandra Suchomska on Aug 30, 2022, 9:55 am

Hi,

my team is doing the integrative process letter for the first time. How long should it be? How detailed should be the description of each analyzed area? 

Last reply: Marcus Sheffer, Sep 2, 2022, 3:26 pm

expiration date of laboratory tests

NC-v4 EQc2: Low-emitting materials
posted by Agata Mozer on Aug 2, 2022, 5:45 am

Hi,

v4.1 credit language states: "Manufacturer statements must also include a summary report from the laboratory that is less than three years old". I didn't find anthing regarding the...

Last reply: Randal Carter, Aug 5, 2022, 12:37 pm

CEN/TS 16516, ISO 16000-3, ISO 16000-6, ISO 16000-9, ISO 16000-11, EN 13419

NC-v4.1 EQc2: Low-emitting materials
posted by Agata Mozer on Aug 5, 2022, 9:29 am

Hi,

Do you know if tests of flooring systems performed according to CEN/TS 16516, ISO 16000-3, ISO 16000-6, ISO 16000-9, ISO 16000-11, EN 13419 each in the latest versions by Eurofins...

CEN/TS 16516, ISO 16000-3, ISO 16000-6, ISO 16000-9, ISO 16000-11, EN 13419

CI-v4.1 EQc2: Low emitting materials
posted by Agata Mozer on Aug 1, 2022, 10:13 am

Hi,

Do you know if tests of flooring systems performed according to CEN/TS 16516, ISO 16000-3, ISO 16000-6, ISO 16000-9, ISO 16000-11, EN 13419 each in the latest versions by Eurofins...