Topic | Recent |
---|---|
Industrial NormalizationEBOM-v4 EAp2: Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on Aug 5, 2016, 4:53 am
I am working on industrial project and below is the leed reviewer comments that is confusing for me how to deal with it and how to normalize to resole these issues ? The end-use breakdown... Last reply: Ramon Christopher Medrano, Sep 20, 2023, 2:34 am |
|
Our project needs some clarification regarding Minimum Indoor Air Quality Performance Calculator.CI-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Sep 19, 2023, 4:47 am
One of my LEED v4 ID+C project getting below comments from LEED reviewer for Minimum Indoor Air Quality Performance Calculator (Project having... Last reply: Nagaraj Sankar, Sep 19, 2023, 11:53 pm |
|
Offsite renewable energy productionNC-v4.1 EAc5: Renewable energyposted by Subhashkumar A on Sep 19, 2023, 12:59 pm
The project is planning to achieve... Last reply: Marcus Sheffer, Sep 19, 2023, 1:24 pm |
|
Inherently non emitting sourcesNC-v4.1 EQc2: Low-emitting materialsposted by Subhashkumar A on Sep 5, 2023, 9:35 pm
The project consists of ceramic tile flooring and precast concrete ceiling panels in some areas. According to LEED standards, these products are inherently non-emitting sources. How can we... Last reply: Subhashkumar A, Sep 19, 2023, 1:14 pm |
|
Sample testing required?Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Jonathan Burgess on Sep 19, 2023, 12:48 pm
Hello everyone, Looking to understand better the requirements on the Sample testings side for this pilot credit. Do we need to submit an actual testing sample performed, with results? or... |
|
Welcome to the LEEDuser job boardHelp Wanted: LEED-related Jobsposted by Paula Melton on Mar 2, 2022, 12:29 pm
Hi! This job board is a new feature we're trying out here at LEEDuser. If you're hiring—and we know many of you are looking for help—please feel free to start a new post to let people know about... Last reply: Trikay Transformation, Sep 19, 2023, 8:43 am |
|
INpc155- Design for Indoor Air Quality and Infection ControlCS-v4 INc1: Innovationposted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm
Hi all, The Pilot Credit: Design for... Last reply: Maria Porter, Sep 19, 2023, 3:58 am |
|
Baseline HVAC system typeHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Sep 14, 2023, 9:14 am
All, We are working on a project in which the predominant space type is Hotel rooms; hence, Baseline HVAC system type 2 has been selected. However, there are several spaces, such as BOH... Last reply: Marcus Sheffer, Sep 18, 2023, 2:25 pm |
|
Baseline for Projects with Several Physically Distinct StructuresNC-v4 MPR3: Must comply with project size requirementsposted by Mike Mentzos on Sep 15, 2023, 6:57 am
All, We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300... |
|
Air Economizer laboratoryNC-v4 EAp2: Minimum Energy Performanceposted by Abdulrahman Alshbeeb on Sep 15, 2023, 3:08 am
We have a laboratory with very high indoor air requirements. Due to the high demands on the quality of the room air, no air may be circulated.... |