Topic | Recent |
---|---|
No EPD for ConcreteNC-v4.1 MRc1: Building life-cycle impact reductionposted by Aishwarya Katta on Apr 1, 2025, 5:50 pm
Hi All, We get a lot of concrete mixes that have reduced carbon footprint, however we're not able to use that for LEED because they dont have EPDs. I was wondering if LEED with accept the... |
|
Historical building and Existing building part of connected structureNC-v4 MRc1: Building life-cycle impact reductionposted by Edgar Arevalo on Apr 1, 2025, 1:40 pm
I have courthouse project that involves two existing buildings being connected with a newly constructed third building. Since one of the existing buildings connected to the third one is... Last reply: Edgar Arevalo, Apr 1, 2025, 1:43 pm |
|
Green-e energy certificate accounted for in EA credit- v4 x v4.1NC-v4 EAc2: Optimize Energy Performanceposted by A&L SUSTENTABILIDADE on Feb 24, 2022, 11:45 am
Our project is registered under the LEED v4, but we have substituted the EAc5 and EAc7 with the EA credit Renewable Energy from LEED v4.1, we intend to use the Tier 2 and purchase... Last reply: Luis Andrade, Apr 1, 2025, 4:24 am |
|
WEc Water MeteringNC-v4 WEc4: Water meteringposted by Theresa Lehman on Mar 25, 2025, 9:55 am
I am working on a homeless shelter project with three large water uses: kitchen, laundry, bathrooms (toilets, sinks & showers) where toilets are on cistern water. I am wondering if the... Last reply: Dave Hubka, Mar 31, 2025, 12:27 pm |
|
Pilot-Credits EQpc114- Learning controls for thermal comfortPilot-Credits EQpc114: Learning controls for thermal comfortposted by Rachel Bundy on Apr 20, 2021, 3:45 pm
Since this is listed as an alternative compliance path for LEED v4 ID&C Thermal Comfort; if we meet the requirements for both IEQ credit Thermal Comfort and the requirements for the pilot... Last reply: Ramon Christopher Medrano, Mar 30, 2025, 10:35 pm |
|
BUG ratings for recessed down lightsNC-v4 SSc6: Light Pollution Reductionposted by Brightworks Sustainability on Nov 3, 2015, 11:27 am
Hi Bill, Do you know how to account for exterior lighting that does not have published BUG ratings? We are trying to get this information from the architect but he says that most of the... Last reply: Alexandra Pop, Mar 29, 2025, 4:06 am |
|
Composting Audit or Estimate Volume?Pilot-Credits SSpc129: Comprehensive Compostingposted by Allison Smith on Jan 31, 2022, 12:33 am
We are working on a small commercial office space whose staff have flexible work arrangements. In this new office space, the staff is commited to composting and championed a composting program... Last reply: Rebecca Rice, Mar 28, 2025, 1:09 pm |
|
Process Chiller in a Lab Building: 90.1-2019 Baseline vs. ProposedNC-v4 EAp2: Minimum Energy Performanceposted by Kristy M. Walson on Mar 19, 2025, 6:16 pm
We're working on a 35,000 SF lab building on a campus district cooling loop. The baseline system type is #5, so there's no chilled water in the baseline. The project overcoming the process heat... Last reply: Marcus Sheffer, Mar 28, 2025, 10:41 am |
|
District Cooling Plant- Chilled Water MeteringNC-v4 EAc3: Advanced Energy Meteringposted by Junaid Mujahid on Mar 21, 2025, 4:24 am
Hi Everyone, For a project connected with DCP, is it sufficient to meter the chilled water coming into the project using a single BTU meter for the 'Space Cooling' end use? What if the... Last reply: Marcus Sheffer, Mar 28, 2025, 10:38 am |
|
Green Power Purchased from UtilityNC-v4.1 EAc5: Renewable energyposted by Jennifer Wehling on Mar 27, 2025, 5:23 pm
We are working on a new building on a college campus for which the District purchases... Last reply: Marcus Sheffer, Mar 28, 2025, 10:31 am |