Forum quick links
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
questions about additional HVAC system in kitchen
CS-2009 EAp2:Minimum Energy Performanceposted by Zhang Peng on
Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review.
Commissioning using generator
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Omar Elrawy on
Dear all, I have a case where project team suggests running all Cx activities on the building's emergency generator, in addition to an external generator.
Survey Participants
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Fareed Alghimlas on
We’re working towards the certification of a large office building, where a good portion of the (FTEs) are subcontractors who spend time (minimum 40hrs/week) in the building but don’t necessarily h
Satisfaction rating
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Fareed Alghimlas on
Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?
Bus shuttle Service to previous location
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Doreen Kruschina on
We have a project in Gallin, a small town with almost no public transport facilities.
vegetated roof - depth of medium
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Catharina B on
Hi In our project we are trying to achieve this credit via the option of a vegetated roof. However, the depth of the growing medium will be less than 6 inches.
Crawl Space Inquiry
NC-2009 PIf2:Project Summary Detailsposted by Sara Zoumbaris on
Should a crawl space be included in the GSF of a project if it's completely empty (not hosting any mechanical equipment?) If the crawl space DOES have mechanical equipment within it, should it be i
MBCx scope for LEED-CI
CI-v4 EAc1:Enhanced commissioningposted by Mark Benson on
The project scope includes new HVAC equipment & controls as well as occupancy sensors for lighting control.
Private vegetated terrace vs roof area
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Catharina B on
Hi On my CS project office mixed with top floor of apartments will be private terrace and I read that private vegetated terraces do not counted towards SS c5.2 so I understand that they also do no