Forum quick links
what all is included in material cost
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Brianna Brandsen on
Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?
Building footprint
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Febin Mohamed on
We are doing a campus approach for our project.
Low-Emitting Content Criteria for Wallcovering in EBOM v2009
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Noriko Nagazumi on
Do you have any idea for Low-Emitting Content (VOC) criteria of wallcovering like adhesives or sealants for LEED EBOM v2009 projects? Our project is an office building, and vinyl wallcoverings in s
Multi-occupant Spaces Vs. Patients rooms
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by VICTOR MORENO on
Hi, I´m managed a Healthcare buildings. The reviewer advice me that workstation and share multi-occupant spaces must be reported consistently among IEQc6.1 and IEQc6.2 credits.
Multi-occupant Spaces Vs. Patients rooms
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by VICTOR MORENO on
Hi, I´m managed a Healthcare buildings. The reviewer advice me that workstation and share multi-occupant spaces must be reported consistently among IEQc6.1 and IEQc6.2 credits.
Frequency of rides per day that have to be given by the shuttle
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jorge Lopez de Obeso on
We are working on a project in which the nearest bus stop is just over a quarter mile so it is proposed to provide a shuttle service to take users to the bus stop.
Roof Assembly
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
If we are making repairs to the exterior of the roof, can we then account for the entire roof as a roof assembly where Exterior sheathing/surface is one layer, structural elements is 2nd layer and
"DES Energy Cost" Thread Follow-Up
NC-2009 EAc1:Optimize Energy Performanceposted by Joseph Chappell on
In a previous post titled "DES Energy Cost" dating back to May 13, 2013, my interpretation of the responses in the thread is that a project can choose to either follow 90.1 or the DES Guidance from
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Toilet Partitions
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
How would Toilet Partitions be accounted for? We are leaving a bathroom as is. Do we treat tlt partitions like cabinetry and count surface area? Or would they be considered 'furniture'?