We are doing a campus approach for our project. For pursuing SSc 5.2, Case 2 "Open space that is equal to the building footprint can be
considered separate from the project site, as long as the open space is preserved for the life of the building. The open space must be contained within the LEED campus boundary." Does these include utility buildings also?